4% of nearby decided applications were refused. The site check found 186 decisions within 5 km, 2 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
UPGRADING OF THE NEWTOWNCUNNINGHAM WASTEWATER TREATMENT PLANT CONSISTING OF UPGRADING OF THE EXISTING INLET WORKS, CONSTRUCTION OF (1)STORM WATER HOLDING TANK COMPLETE WITH CLEANING SYSTEM AND ACCESS STAIRS, (2) 2 NO. NEW PUMPING STATIONS; (3) NEW SLUDGE HOLDING TANK COMPLETE WITH ACCESS STAIRS AND HANDRAILING AND ALL ANCILLARY SITE DEVELOPMENT WORKS INCLUDING HARD AND SOFT LANDSCAPING
(1) CONSTRUCTION OF A SPECTATOR STAND WITH TOILET FACILITIES AND REBOUND WALL, AND (2) INSTALLATION OF FLOODLIGHTING AND BALL STOPS
(A) PROVISION OF ADDITIONAL CAR PARKING SPACES TO THE EAST OF THE SITE, (B) RECONFIGURED CAR PARKING ARRANGEMENTS IN LIEU OF PREVIOUSLY GRANTED ARRANGEMENT PLANNING REF. NO. 17/50938, (C) RELOCATED GAS TANK AT REAR OF SITE, (D) RELOCATED CAR WASH AREA WITH ATTENDANTS HUT AND CAR VALET AREA WITH ROOF OVER TO REAR OF SITE, (E) RELOCATED ENCLOSURE TO BINS AREA AT REAR OF SITE
MOBILE HOME TEMPORARILY PLACED ON SITE DURING RECONSTRUCTION OF DWELLING DUE TO DEFECTIVE MICA BLOCKWORK WITH CONNECTION TO EXISTING SEWAGE SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF ATTACHED SHED TO THE NORTHERN ELEVATION AND (2) CONSTRUCTION OF (A) SINGLE STOREY EXTENSION TO THE NORTHERN (REAR) ELEVATION OF EXISTING DWELLING HOUSE AND (B) DETACHED DOMESTIC GARAGE AND ALL ASSOCIATED WORKS AND SITE DEVELOPMENTS WORKS
(1) REFURBISHMENT OF THE COLUMBAN HALL, (2) DEVELOPMENT OF A CHILDRENS PLAYPARK, COMMUNITY GARDENS AND A SENSORY GARDEN ON THE EXISTING GREEN AREA OF THE HALL GROUNDS AND (3) REPLACEMENT OF THE EXISTING BOUNDARY WALL WITH A COMMUNITY OPEN SHELTER INCLUDING SEATING, WIFI AND CHARGING POINTS ALONG WITH ALL ASSOCIATED WORKS
The brief summarizes the pattern across all 186 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1951928The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief