Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 259 decisions within 5 km, 3 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DEMOLITION OF THE EXISTING DWELLING HOUSE AND SHEDS AND TO DECOMMISSION THE EXISTING SEPTIC TANK SYSTEM AND ERECTION OF A NEW REPLACEMENT DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
IMPORTED FILL MATERIAL FROM THE ADJACENT SITE AND PERMISSION FOR ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF AN ASTRO TURF PITCH, WITH BOUNDARY FENCING/NETTING AND ALL ASSOCIATED SITE WORKS
(1) ALTERATION WORKS AND REORIENTATION OF DWELLING HOUSE PREVIOUSLY APPROVED UNDER PLANNING REF. NO. 04/921 AND (2) DETACHED DOMESTIC GARAGE AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF (A) A SINGLE STOREY PITCHED ROOF DETACHED DWELLING HOUSE AND DOMESTIC PITCHED ROOF GARAGE (B) A VEHICULAR ENTRANCE ON TO THE PUBLIC ROAD (2) INSTALLATION OF A SEPTIC TANK/SEWERAGE TREATMENT UNIT AND PERCOLATION AREA AND ALL ASSOCIATED SERVICES AND SITE DEVELOPMENT WORKS
CONSTRUCTION OF AN EXTENSION TO THE REAR OF SCHOOL BUILDING COMPRISING OF 1 NO. RESOURCE ROOM WITH LOBBY AND ALTTERATIONS TO ACCOMMODATE SAME
The brief summarizes the pattern across all 259 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2050175The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief