Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 109 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK
ERECTION OF AN EXTENSION TO THE FRONT OF EXISTING DWELLING HOUSE, DEMOLITION OF EXISTING GARAGE TO BE REPLACED WITH NEW EXTENSION TO THE SIDE\REAR OF THE DWELLING
(1) DOMESTIC GARAGE AS CONSTRUCTED, (2) CHANGE OF USE OF FIRST FLOOR FROM DOMESTIC GARAGE TO ANCILLARY ACCOMMODATION AND (3) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A DWELLING HOUSE & DOMESTIC GARAGE WITH SEPTIC TANK AND ALL ASSOCIATED SITEWORKS
(1) REFURBISHMENT OF EXISTING DWELLING HOUSE, (2) ERECTION OF AN EXTENSION ONTO EXISTING DWELLING HOUSE, (3) INSTALLATION OF NEW WASTEWATER TREATMENT SYSTEM AND (4) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
(1) REFURBISHMENT OF EXISTING DWELLING HOUSE, (2) ERECTION OF EXTENSION ONTO EXISTING DWELLING HOUSE WITH (3) INSTALLATION OF NEW WASTEWATER TREATMENT SYSTEM AND (4) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING THE PROPOSED DIVERSION OF THE EXISTING PRIVATE ACCESS ROAD
The brief summarizes the pattern across all 109 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2050394The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief