Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 534 decisions within 5 km, 4 exact-site or onsite candidate records, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) CONSTRUCTION OF A DWELLING HOUSE, (2) INSTALLATION OF A SECONDARY AND TERITIARY EFFLUENT TREATMENT SYSTEM AND DISCHARGE TO A DISPOSAL/DISTRIBUTION PAD, (3) ERECTION OF AN AGRICULTURAL BUILDING WITH SLATTED TANK TO ACCOMMODATE SHEEP AND (4) ALTERATIONS AND WIDEN THE EXISTING SITE ENTRANCE ONTO THE PUBLIC ROAD, INCLUSIVE OF ALL ASSOCIATED SITE WORKS (SITE ACCESS IS VIA A PROPOSED BRIDGE AS GRANTED PERMISSION UNDER 17/50114). A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
(1) ERECTION OF A DWELLING HOUSE, INSTALLATION OF A SECONDARY AND TERTIARY EFFLUENT TREATMENT SYSTEM,DISCHARGE TO A DISPOSAL/DISTRIBUTION PAD, SITE ACCESS IS VIA A PROPOSED BRIDGE AS GRANTED PERMISSION UNDER 17/50114 AND (2) ALTERATION AND WIDENING OF THE EXISTING SITE ENTRANCE ONTO THE PUBLIC ROAD, INCLUSIVE OF ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A BRIDGE AND ALL ASSOCIATED SITEWORKS
UPGRADING OF EXISTING BINBANE TO CATHALEEN'S FALL 110KV OVERHEAD LINE CIRCUIT CONSISTING OF (1) REPLACEMENT OF (A) ("RESTRINGING") OF THE EXISTING OVERHEAD LINE CIRCUIT CONDUCTOR WIRES WITH NEW CONDUCTOR WIRES INCLUDING A FIBRE TELECOMMUNICATIONS CABLE (B) 106 NO. EXISTING POLESETS AND 17NO. ANGLE MASTS - ANY REPLACEMENT STRUCTURES WILL BE CONSTRUCTED AT, OR IMMEDIATELY ADJACENT TO THE EXISTING STRUCTURES THEY WILL REPLACE, WILL BE ALONG THE SAME ALIGNMENT AS EXISTING, AND WILL BE OF A GENERALLY SIMILAR HEIGHT AND APPEARANCE UNLESS OTHERWISE STATED (C) 1 NO. EXISTING POLESETS WITH 1NO. 4 POLE POLESET IN THE TOWNLAND OF OUGHTNADRIN (2) THE REMOVAL OF 1 NO. ANGLE MAST IN THE TOWNLAND OF TULLY AND 1 NO. POLESET IN THE TOWNLAND OF CARRICK WEST (3) PROVISION OF 1NO. ANGLE MAST IMMEDIATELY ADJACENT TO CATHALEEN'S FALL SUBSTATION IN THE TOWNLAND OF BALLYHANNA (4) A LOCAL ALTERATION TO THE EXISTING CIRCUIT ALIGNMENT IN THE TOWNLANDS OF CLARCARRICKNAGUN AND DRUMMENNY MIDDLE WHICH WILL INVOLVE THE REPLACEMENT OF 2NO. EXISTING POLESETS WITH 2NO. ANGLE MASTS, AND THE REMOVAL OF 1NO. POLESET AND 2 NO. ANGLE MASTS (5) ALL ASSOCIATED SITE DEVELOPMENT WORKS, INCLUDING FOUNDATION UPGRADE WORKS (6) ALL ASSOCIATED WORKS WITHIN THE EXISTING BINBANE AND CATHALEEN'S FALL SUBSTATIONS TO ACCOMMODATE THE UPRATED 110KV OVERHEAD LINE INCLUDING ALTERATIONS TO EXISTING APPARATUS (7) ALL ASSOCIATED TEMPORARY SITE DEVELOPMENT WORKS TO GAIN ACCESS TO THE EXISTING STRUCTURES INCLUDE CLEARANCE OF VEGETATION, DISASSEMBLY AND REASSEMBLY OF GATE POSTS / PIERS AND REMOVAL AND REINSTATEMENT OF EXISTING FENCING (8) OTHER TEMPORARY ASSOCIATED AND ANCILLARY SITE DEVELOPMENT WORKS REQUIRED FOR THE PURPOSE OF THE UPRATE OF THE EXISTING CIRCUIT, INCLUDING THE INSTALLATION OF SILT TRAPS, SILT FENCES, STONE TRACKS, BOG MATS AND TEMPORARY WATERCOURSE CROSSINGS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
DECOMMISSIONING EXISTING SEPTIC TANK SYSTEM AND REPLACEMENT WITH NEW SEPTIC TANK, REED BED AND WETLAND AREA
CONSTRUCTION OF A NEW EXTENSION TO THE EXISTING COTTAGE AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 534 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2050447The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief