Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 528 decisions within 5 km, 1 exact-site or onsite candidate record, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE REAR OF EXISTING DWELLING, FOR THE CONSTRUCTION OF TWO BAY-WINDOWS IN LIEU OF EXISTING WINDOWS TO FRONT ELEVATION AND FOR THE REMOVAL OF AN EXISTING CHIMNEY TO GABLE SIDE OF HOUSE
DEMOLITION OF SINGLE STOREY EXTENSION TO THE SIDE ELEVATION AND CONSTRUCTION OF A 2 STOREY EXTENSION TO THE SIDE AND 2 NO. SINGLE STOREY EXTENSIONS TO THE FRONT AND REAR ELEVATIONS OF EXISTING DWELLING HOUSE AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) UPSIZING OF APPROXIMATELY 130M OF 225MM SEWERS TO 300MM MINIMUM DIAMETER FROM MEETINGHOUSE LANE TO CHAPEL STREET, STRANORLAR (2) UPSIZING OF APPROXIMATELY 60M OF 225MM SEWER TO 375MM MINIMUM DIAMETER IN CHAPEL STREET, STRANORLAR (3) UPSIZING OF APPROXIMATELY 55M OF 225/300MM SEWER TO 375MM MINIMUM DIAMETER IN CHAPEL CLOSE, STRANORLAR (4) UPSIZING OF APPROXIMATELY 195M OF 225/300MM SEWER TO 375MM MINIMUM DIAMETER FROM CHAPEL CLOSE TO MAIN STREET, STRANORLAR (5) UPSIZING OF APPROXIMATELY 405M OF 225/300MM SEWER TO 525MM MINIMUM DIAMETER IN MAIN ST AND WATER LANE, STRANORLAR (6) CONSTRUCTION OF NEW STORM OVERFLOW CHAMBER AT BALLYBOFEY BRIDGE INCLUDING APPROXIMATELY 8M OF 525MM MINIMUM DIAMETER OVERFLOW TO THE RIVER FINN (7) DECOMMISSIONING OF THE FOLLOWING STORM OVERFLOWS: MAIN STREET CSO AND CHAPEL CLOSE CSO (8) ALL ASSOCIATED SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CONSTRUCTION OF A DETATCHED DOMESTIC GARAGE WITH CAR PORT AND ASSOCIATED SITE DEVELOPMENT WORKS
EXISTING DWELLING HOUSE AND DOMESTIC GARAGE AND ASSOCIATED SITE WORKS
(1) CHANGE THE USE OF A STORAGE BUILDING INTO AN AFTERSCHOOL ROOM, (2) EXTENSION OF THE CURRENT STORAGE BUILDING, TO INCLUDE AN ADDITION OF A LAUNDRY AREA AND A STORAGE CONTAINER, AND ALL RELATED SITE WORKS
The brief summarizes the pattern across all 528 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2050474The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief