Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 310 decisions within 5 km, 1 exact-site or onsite candidate record, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF AN EXTENSION TO THE REAR AND FRONT OF EXISTING DWELLING HOUSE
UPGRADED PERCOLATION AREA AND PERMISSION FOR (1) DEMOLITION OF EXISTING DOMESTIC GARAGE, (2) EXTENSION AND RENOVATION OF EXISTING DWELLING HOUSE WITH ALTERATIONS TO ALL FACADES, CONNECTION TO ALL EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF 1 NO. SINGLE STOREY DWELLING WITH MECHANICAL AERATION TANK AND WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED WORKS
CONSTRUCTION OF 1 NO. 1 & 1/2 STOREY DWELLING WITH MECHANICAL AERATION TANK AND WASTE WATER TREATMENT SYSTEM WITH ALL ASSOCIATED WORKS
ERECTION OF AN EXTENSION AND RENOVATIONS TO EXISTING DWELLING HOUSE CONSISTING OF (1) DEMOLITION OF EXISTING REAR EXTENSION (2) CONSTRUCTION OF A NEW REAR EXTENSION (3) ELEVATIONAL AMENDMENTS TO ALL FACADES (4) MINOR MODIFICATIONS TO THE ROOF ALIGNMENT (5) DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM AND INSTALLATION OF NEW WASTE WATER TREATMENT SYSTEM (6) ERECTION OF A DOMESTIC GARAGE/OUT BUILDING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
A SUNROOM EXTENSION TO DWELLING & SAFETY BARRIER RAILINGS ON GARAGE ROOF
The brief summarizes the pattern across all 310 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2050504The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief