Applications tied to the site
Partial coverage13 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
13 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,171 decisions within 5 km, 13 exact-site or onsite candidate records, and 64 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
13 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
13 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
64 structured nearby appeal records.
64 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A WHOLESALE WAREHOUSE AND COMMERCIAL STORAGE BUILDING WITH ANCILLARY OFFICE SPACE. THE DEVELOPMENT INCLUDES ON-SITE CAR PARKING AND VEHICLE TURNING SPACE, SIGNAGE, BOUNDARY TREATMENT AND ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING CONNECTION TO ALL MAINS SERVICES
ERECTION OF 2 NO. PREFABRICATED CHANGING ROOMS
(1) 2 NO. EXISTING PREFABRICATED GENERAL PURPOSE BUILDINGS AND (2) EXISTING STEEL FRAME BUILDING CONTAINING OFFICE/MEETING ROOM
ERECTION OF A NEW ROADSIDE DIGITAL SIGN
(1) ALTERATIONS AND EXTENSION TO EXISTING COMMUNITY CENTRE BUILDING TO PROVIDE NEW MULTI-PURPOSE HALL, CHANGING & TOILET FACILITIES, MEETING/TRAINING ROOMS, TREAMENT ROOMS, GYMNASIUM, COFFEE DOCK & SEATING AREA, STAFF FACILITIES & STORAGE FACILITIES & CONNECTION TO EXISTING SERVICES (2) DEMOLITION OF 3 NO. STAND ALONE PREFABRICATED STRUCTURES & DEMOLITION OF EXISTING FRONT PORCH ON THE FRONT ELEVATION OF THE EXISTING COMMUNITY CENTRE BUILDING
CONSTRUCTION OF NEW CHANGING ROOM FACILITIES, NEW COMMUNITY/COMMITTEE ROOM & NEW SPECTATOR STAND, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 1,171 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2050508The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief