Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 282 decisions within 5 km, 4 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF A SINGLE STOREY 100 M2 TEMPORARY PREFABRICATED CLASSROOM TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING CONNECTION TO EXISTING ON-SITE SERVICES
(1) CONSTRUCTION OF (A) A NEW SINGLE STOREY ASD CLASSROOM SUITE WITH OFFICE, SANITARY FACILITIES, STORES, AND ANCILLARY TEACHING & PLAYROOMS TO THE REAR OF THE SCHOOL WITH INTERCONNECTION TO THE EXISTING SCHOOL (B) A SENSORY GARDEN WITH ALL ASSOCIATED FENCING, PLANTING & CONSTRUCTED FEATURES (C) AN ASTRO TURF ALL WEATHER SPORTS PITCH WITH 3M HIGH PALLADINE FENCING (2) ALL ASSOCIATED SITE DEVELOPMENT WORKS AND CONNECTIONS TO THE EXISTING SERVICES
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO FACILITATE DOWNSTAIRS BEDROOM AND EXTENDED HALLWAY TO ACCOMODATE STAIR LIFT
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO FACILITATE DOWNSTAIRS BEDROOM AND EXTENEDED HALLWAY TO ACCOMODATE STAIR LIFT
COMPLETION OF CONSTRUCTION WORKS OF 33 NUMBER DWELLING HOUSES CURRENTLY UNDER CONSTRUCTION AND ORIGINALLY PERMITTED AS PART OF A SCHEME OF 45 DWELLING HOUSES UNDER PLANNING REF 99/4329 KNOWN AS 'ARD TOMAIRE' (EXTENSION OF DURATION REF 06/60536) AND WORKS TO INCLUDE ALL ASSOCIATED SITE DEVELOPMENT WORKS
DEVELOPMENT OF A SHARED COMMUNITY SPACE TO BE LOCATED ALONG THE FORMER RAILWAY LINE AND WHICH SHALL INCLUDE THE FOLLOWING (A) PEDESTRIAN FOOT WALKS, SEATING AND EXERCISE AREAS (B) COMMUNITY GARDEN AREAS/ZONES AND PLANTING TO ALL BOUNDARY AND EMBANKMENT AREAS (C) ERECTION OF A POLYTUNNEL STRUCTURE AND OUTDOOR CLASSROOM BUILDING AND (D) CONSTRUCTION OF A CAR PARKING AREA, PEDESTRIAN LINKAGE POINTS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 282 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2050686The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief