Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

STONEY HILL INDUSTRIAL PARK , KILLYBEGS , DONEGAL POOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

STONEY HILL INDUSTRIAL PARK , KILLYBEGS , DONEGAL PO

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

7% of nearby decided applications were refused. The site check found 259 decisions within 5 km, 1 exact-site or onsite candidate record, and 11 structured appeals.

Matched source
2051141
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

11 structured nearby appeal records.

11 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

259Nearby applications
1Site-linked candidates
7%Nearby refused
11Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

2051141

(1) SITE WORKS INCLUDING REDUCED LEVEL EXCAVATIONS TO PROVIDE SUITABLE LEVELS FOR THE BUILDING, VEHICULAR ACCESS & CIRCULATION, CAR PARKING & YARD. THE EXCAVATION WORK MAY NECESSITATE ROCK BREAKING USING A CONTROLLED BLASTING TECHNIQUE IN CONJUNCTION WITH MECHANICAL ROCK BREAKING ACTIVITY. (2) CONSTRUCTION OF A NEW FISH PROCESSING FACILITY WITH ASSOCIATED OFFICES, LABORATORIES, PLANT, EQUIPMENT, COLD STORAGE, PRODUCT STORAGE, STAFF CHANGING & REST ROOMS. THE FACILITY WILL PROCESS UP TO 50,000 TONNES OF FISH PER ANNUM PRODUCING HIGH END PROTEINS, OILS AND CALCIUM FOR DESPATCH AS FOOD INGREDIENTS. CONSTRUCTION WORK WILL INCLUDE A DETACHED 30M HIGH CYLINDRICAL DRIER BUILDING, CHIMNEY STACK AND OTHER ASSOCIATED ITEMS OF PLANT & EQUIPMENT OUTSIDE THE MAIN BUILDING ENVELOPE. AN ENVIRONMENTAL IMPACT STATEMENT AND A NATURA IMPACT STATEMENT HAVE BEEN SUBMITTED WITH THE APPLICATION. THE APPLICATION RELATES TO A DEVELOPMENT WHICH IS FOR AN ACTIVITY REQUIRING AN INDUSTRIAL EMISSIONS LICENCE UNDER CLASS 7.8 (A) (I) OF THE NEW FIRST SCHEDULE TO THE EPA ACT AS AMENDED

Granted0.0 km01 October 2020
1950546

EXTENSIONS TO EXISTING FISH PROCESSING FACILITY CONSISTING OF COLD STORAGE, FREEZERS AND GENERAL PRODUCTION AREAS

Granted0.1 km07 June 2019
1951021

GROUNDWORKS COMPLETED ON SITE AND PERMISSION FOR ERECTION OF A DRY GOODS STORE INCLUDING TOILET WITH CONNECTION TO MAINS SEWER INCLUDING ALL ASSOCIATED SITE WORKS

Granted0.1 km15 August 2019
1950119

STORAGE YARD WITH WEIGH BRIDGE, BOUNDARY FENCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

Granted0.1 km21 March 2019
2050895

AMENDMENTS TO WORKS PREVIOUSLT APPROVED UNDER PLANNING REF. NO. 14/50238 AND DURATION EXTENDED UNDER PLANNING REF. NO. 19/50119 WHICH WILL CONSIST OF 1) EXTENSION TO SITE BOUNDARIESTO THE SOUTH AND WEST BY AN ADDITIONAL 1.71 HECTARES FOR USE AS STORAGE SPACE 2) PROVISION OF SITE EXCAVATION AND DEVELOPMENT WORKS TO REDUCE LEVELS AND FILL LEVELS ACCORDINGLY 3) EXTENSION OF SITE BOUNDARY FENCING WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS

Granted0.2 km20 August 2020
2561829

TEMPORARY STORAGE OF ENGINEERING PARTS AND COMPONENTS AND PERMISSION FOR (1) SITE LEVELLING AND RAISING OF GROUND LEVELS USING EXCAVATED MATERIAL AND IMPORTED SOIL AND STONE FILL, (2) CONTINUATION OF TEMPORARY STORAGE OF ENGINEERING PARTS AND COMPONENTS AND (3) ERECTION OF PERIMETER SITE BOUNDARY FENCE AND GATE

Granted0.2 km05 December 2025

The brief summarizes the pattern across all 259 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required