Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,170 decisions within 5 km, 8 exact-site or onsite candidate records, and 65 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
65 structured nearby appeal records.
65 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
ERECTION OF AN EXTENSION TO THE REAR OF EXISTING DWELLING HOUSE
CHANGE OF USE OF FORMER FIRST FLOOR OFFICES OF DONEGAL NEWS TO A COMMUNITY CENTRE
CONSTRUCTION OF AN EXTENSION TO THE FRONT OF EXISTING CAFÉ PREMISES AND ALL ASSOCIATED SITE WORKS
(1) RETENTION OF CHANGE OF USE AND COMPLETION OF VACANT COMMERCIAL PREMISES TO HOSTEL RESIDENTIAL ACCOMMODATION, (2) RETENTION OF ALL ELEVATIONAL CHANGES THAT HAVE BEEN CARRIED OUT, (3) CONSTRUCTION OF 3 NO. NEW LIGHT WELLS TO PROVIDE NATURAL LIGHT TO PART OF THE BUILDING AND (4) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION AND RE-CONFIGURATION OF BUILDING ELEMENTS THAT PREVIOUSLY FORMED PART OF THE FORMER MILAN NIGHTCLUB AREA OF THE HOTEL, (2) CONSTRUCTION OF A NEW 4 STOREY SIDE EXTENSION PROVIDING AN ADDITIONAL 35 BEDROOMS, (3) NEW FIFTH FLOOR LEVEL OVER THE EXISTING BEDROOM BLOCK TO PROVIDE AN ADDITIONAL 26 BEDROOMS, (4) NEW EXTENSION AT FOURTH FLOOR LEVEL OVER EXISTING BEDROOM BLOCK TO PROVIDE A NEW SPA FACILITY, (5) EXTENSION OF THE MAIN LIFT TO 4TH FLOOR LEVEL TO PROVIDE DIRECT ACCESS FROM RECEPTION AREA TO THE SPA AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE DEVELOPMENT AS PROPOSED WAS PREVIOUSLY PERMITTED UNDER REG. REF. NO. 18/51502 DONEGAL COUNTY COUNCIL (ABP-304973-19)
DEMOLITION AND RE CONFIGURATION OF BUILDING ELEMENTS THAT PREVIOUSLY FORMED PART OF THE FORMER MILAN NIGHTCLUB AREA OF THE HOTEL, CONSTRUCTION OF A NEW 4 STOREY SIDE EXTENSION PROVIDING AN ADDITIONAL 35 BEDROOMS, NEW FIFTH FLOOR LEVEL OVER THE EXISTING BEDROOM BLOCK TO PROVIDE AN ADDITIONAL 26 BEDROOMS, NEW EXTENSION AT FOURTH FLOOR LEVEL OVER EXISTING BEDROOM BLOCK TO PROVIDE A NEW SPA FACILITY. THE PROPOSAL ALSO INCLUDES EXTENDING THE MAIN LIFT TO 4TH FLOOR LEVEL TO PROVIDE DIRECT ACCESS FROM RECEPTION AREA TO THE SPA AREA
The brief summarizes the pattern across all 1,170 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2051279The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief