Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 266 decisions within 5 km, 4 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) DECOMMISSIONING AND CLOSE UP THE EXISTING VEHICULAR ENTRANCE AND DRIVEWAY TO PROPERTY (2) DEVELOPMENT OF A NEW VEHICULAR ENTRANCE AND DRIVEWAY TO THE EAST SIDE OF THE EXISTING ENTRANCE, CONNECTION TO EXISTING SURFACE WATER DRAINAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A TWO STOREY EXTENSION TO THE SIDE OF EXISTING PROPERTY WITH CONNECTIONS TO EXISTING SERVICES
A DOMESTIC GARAGE
ERECTION OF AN EXTENSION TO BOTH SIDES AND REAR OF THE EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO MAINS SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING DEVELOPMENT AND COMPLETION OF INTERNAL ACESS ROAD AND VEHICULAR ENTRANCE AND RETENTION OF ALL SITE WORKS TO INCLUDE FORMATION OF INTERNAL ACCESS ROAD
EXCAVATION WORKS INCLUDING THE DEVELOPMENT OF A STONE BERM AND (2) CLOSURE OF EXISTING TEMPORARY ENTRANCE/ACCESS POINT FORMED ON TO THE ADJOINING PUBLIC ROAD AND COMPLETION OF NECESSARY REINSTATEMENT WORKS
The brief summarizes the pattern across all 266 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2051483The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief