Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 206 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
UPGRADING OF OLD SEPTIC TANK WITH NEW TREATMENT SYSTEM AND ASSOCIATED DRAINAGE ALL ON THIS SITE AND PERMISSION FOR DEMOLITION OF EXISTING DWELLING HOUSE AND CONSTRUCTION OF A NEW DWELLING HOUSE WITH ALL SITE WORKS AND ASSOCIATED DRAINAGE. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
(1) DEMOLITION OF EXISTING HABITABLE DWELLING HOUSE, (2) DECOMMISSIONING OF EXISTING SEPTIC TANK, (3) ERECTION OF A NEW REPLACEMENT DWELLING HOUSE AND (4) INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) ADDITION OF A SUNPORCH TO THE WEST GABLE SIDE AND A FUEL STORE TO THE EAST GABLE SIDE OF EXISTING DWELLING HOUSE; (2) CONVERSION OF THE EXISTING GARAGE INTO A BEDROOM WITH ENSUITE AND (3) TO PART RENDER AND CLAD THE EXTERNAL WALLS OF THE DWELLING HOUSE WITH WEATHER BOARD FROM TEGRAL
CONSTRUCTION OF A NEW SUNROOM EXTENSION AT FIRST FLOOR LEVEL, CHANGING EXISTING GROUND LEVEL SUNROOM TO BEDROOM ACCOMMODATION, FORMATION OF A SMALL BALCONY, ACCESS STEPS AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS
(A) DWELLING CONSTRUCTED UNDER PLANNING REFERNCE 92/1127 AND (B) DETACHED DOMESTIC GARAGE AND PERMISSION FOR THE COMPLETION OF DWELLING TO A REVISED DESIGN AND INSTALLATION OF A PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 206 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2051515The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief