Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 117 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
EXISTING SINGLE STOREY EXTENSION TO THE SIDE OF DWELLING ALONG WITH ALL ASSOCIATED SITE WORKS
EXTENSION TO EXISTING DWELLING HOUSE COMPRISING OF A GAMES ROOM AND DOMESTIC GAMES
CONSTRUCTION OF A SMALL EXTENSION TO THE SIDE OF EXISTING DWELLING HOUSE WITH CONNECTION TO EXISTING SERVICES
(A) RETENTION OF EXISTING CONCRETE RETAINING WALL STRUCTURE AND TIMBER FENCE, (B) FILLING IN OF EXISTING EXCAVATED LANDS TO PROVIDE FOR A YARD AND (C) ALL ASSOCIATED SITE WORKS
(1) REMOVAL OF UNAUTHORISED WALL AND CONSTRUCTION OF AN EXTENSION TO THE SIDE ELEVATION OF EXISTING PREMISES KNOWN AS 'THE ALT BAR', AND (2) RETENTION OF SMOKING AREA
UPGRADE WORKS AT KILLEA WASTEWATER TREATMENT PLANT AS FOLLOWS: (1) NEW INLET WORKS (2) 2 NO. PRIMARY SETTLEMENT TANKS (3) STORMWATER HOLDING TANK AND STORMWATER RETURN PUMPING STATION (4) ROTATING BIOLOGICAL CONTRACTOR (RBC) UNITS (5) 2 NO. FINAL SETTLEMENT TANKS (6) NEW ADMINISTRATION BUILDING (6) SLUDGE STORAGE TANK (7) NEW SECURITY FENCE (8) SITE ROADS (9) DEMOLITION OF THE EXISTING ADMINISTRATION BUILDING (10) DECOMMISSIONING OF THE EXISTING SECONDARY TREATMENT UNITS (11) DECOMMISSIONING OF THE EXISTING INLET WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
The brief summarizes the pattern across all 117 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2051569The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief