Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 527 decisions within 5 km, 2 exact-site or onsite candidate records, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) UPSIZING OF APPROXIMATELY 130M OF 225MM SEWERS TO 300MM MINIMUM DIAMETER FROM MEETINGHOUSE LANE TO CHAPEL STREET, STRANORLAR (2) UPSIZING OF APPROXIMATELY 60M OF 225MM SEWER TO 375MM MINIMUM DIAMETER IN CHAPEL STREET, STRANORLAR (3) UPSIZING OF APPROXIMATELY 55M OF 225/300MM SEWER TO 375MM MINIMUM DIAMETER IN CHAPEL CLOSE, STRANORLAR (4) UPSIZING OF APPROXIMATELY 195M OF 225/300MM SEWER TO 375MM MINIMUM DIAMETER FROM CHAPEL CLOSE TO MAIN STREET, STRANORLAR (5) UPSIZING OF APPROXIMATELY 405M OF 225/300MM SEWER TO 525MM MINIMUM DIAMETER IN MAIN ST AND WATER LANE, STRANORLAR (6) CONSTRUCTION OF NEW STORM OVERFLOW CHAMBER AT BALLYBOFEY BRIDGE INCLUDING APPROXIMATELY 8M OF 525MM MINIMUM DIAMETER OVERFLOW TO THE RIVER FINN (7) DECOMMISSIONING OF THE FOLLOWING STORM OVERFLOWS: MAIN STREET CSO AND CHAPEL CLOSE CSO (8) ALL ASSOCIATED SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE REAR OF EXISTING DWELLING, FOR THE CONSTRUCTION OF TWO BAY-WINDOWS IN LIEU OF EXISTING WINDOWS TO FRONT ELEVATION AND FOR THE REMOVAL OF AN EXISTING CHIMNEY TO GABLE SIDE OF HOUSE
DEMOLITION OF SINGLE STOREY EXTENSION TO THE SIDE ELEVATION AND CONSTRUCTION OF A 2 STOREY EXTENSION TO THE SIDE AND 2 NO. SINGLE STOREY EXTENSIONS TO THE FRONT AND REAR ELEVATIONS OF EXISTING DWELLING HOUSE AND ASSOCIATED SITE DEVELOPMENT WORKS
PROVISION OF FLOOD LIGHTING TO THE EXISTING GRASS SPORTS PITCH WHICH WILL INCLUDE THE ERECTION OF 6 NO. 12M HIGH LIGHTING POLES WITH ASSOCIATED POWER DISTRIBUTION DUCTING, SWITCHGEAR AND SITE WORKS
CONSTRUCTION OF A DETATCHED DOMESTIC GARAGE WITH CAR PORT AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF PART OF EXISTING BUILDINGS AND EXISTING PREFABRICATED STRUCTURES TOTALLING 3,510 SQ METRES, THE REFURBISHMENT OF EXISTING RETAINED BUILDING OF 3464 SQ METRES (2) CONSTRUCTION OF A NEW EXTENSION BLOCK OF 7024 SQ METRES CONSISTING OF A NEW MAIN ENTRANCE; 8 NO. GENERAL CLASSROOMS, 18 NO. SPECIALIST CLASSROOMS AND ASSOCIATED PREPARATION AREAS; GENERAL PURPOSE ROOM AND ANCILLARIES; MULTI-USE (PE) HALL AND ANCILLARY SPACES, SPECIAL NEEDS EDUCATION SUITE, LIBRARY, STAFF ROOM; ADMINISTRATIVE SPACES; TOILETS; STORES; PLANT ROOMS; CIRCULATION; EXTERNAL STORE AND COVERED YARD. THE DEVELOPMENT WILL ALSO INCLUDE ALL ASSOCIATED SITE WORKS; REALIGNMENT AND RESURFACING OF EXISITNG DRIVEWAY SET DOWN AND STAFF/VISITOR PARKING AREAS, NEW ACCESS ROAD, NEW COURTYARDS AND PEDESTRIAN PATHS, PROVISION OF BUS TURNING BAY; NEW EXTERNAL PLAY AREAS; NEW HARD AND SOFT LANDSCAPING; NEW SITE BOUNDARIES FENCING AND GATES; UPGRADING AND REROUTING OF OVERHEAD AND UNDERGROUND SERVICES CONNECTED TO PUBLIC NETWORKS, STORM ATTENUATION AND RAIN HARVESTING, NEW PUBLIC LIGHTING AND SIGNAGE (3) ERECTION OF TEMPORARY CLASSROOM ACCOMMODATION OF 130 SQ METRES TO BE LOCATED ON SITE FOR THE DURATION OF WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
The brief summarizes the pattern across all 527 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2051636The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief