Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 274 decisions within 5 km, 3 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) DEMOLITION OF EXISTING DERELICT FORMER SCOIL NAOMH IOSAF NATIONAL SCHOOL BUILDING (2) CONSTRUCTION OF A NEW SINGLE STOREY FOUR CLASSROOM PRIMARY SCHOOL WITH ANCILLARY ACCOMMODATION, ROOF MOUNTED PV SOLAR PANELS AND SCHOOL SIGNAGE (3) NEW CAR PARK WITH DROP OFF AND ASSOCIATED ENTRY AND EXIT POINTS (4) NEW BALL COURT AND JUNIOR PLAY AREA TO THE REAR OF THE PROPOSED SCHOOL (5) ALL ASSOCIATED WORKS AND SITE WORKS INCLUDING CONNECTION TO THE EXISTING STORM AND FOUL DRAINAGE, FENCING, WALLS, LANDSCAPING, PUBLIC LIGHTING, BICYCLE SHELTER, GAS COMPOUND, FLAG POLES AND ALL REMAINING STRUCTURES
EXTENSION TO EXISTING HARD PLAY AREA, FENCE TO SIDES OF PLAY AREA AND NETTING OVER PLAY AREA AND ASSOCIATED SITE WORKS
(1) CONSTRUCTION OF AN EXTENSION TO THE REAR OF SCHOOL CONSISTING OF ONE MAINSTREAM CLASSROOM WITH TOILET FACILITIES, ONE WC FOR ASSISTED USERS, CONNECTION TO EXISTING PUBLIC SEWER (2) REMOVAL OF EXISTING WC BLOCK AND ALL ASSOCIATED SITE WORKS
SINGLE STOREY SIDE EXTENSION TO EXISTING TWO STOREY DWELLING, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF EXISTING GROUND FLOOR KITCHEN EXTENSION, uPVC CONSERVATORY AND REAR EXTENSION, (2) RENOVATIONS AND CONSTRUCTION OF A SINGLE STOREY SIDE EXTENSION AND A TWO STOREY EXTENSION TO REAR AND ALL ASSOCIATED SITE WORKS INCLUDING INSTALLATION OF A NEW PROPRIETARY COMBINED SEWAGE TREATMENT PLANT AS PREVIOUSLY APPROVED (REF.NO:08/70586 REFERS)
CONSTRUCTION OF A TWO-STOREY EXTENSION ONTO THE SOUTH FACING SIDE OF EXISTING TWO STOREY DWELLING HOUSE, THE EXTENSION SHALL INCORPORATE A GROUND FLOOR DINING AND PLAYROOM AND A FIRST-FLOOR BEDROOM WITH EN-SUITE
The brief summarizes the pattern across all 274 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2051662The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief