Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 170 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RENOVATION AND ELEVATIONAL CHANGES TO EXISTING SINGLE STOREY SEMI-DETACHED DWELLING AND ERECTION OF A DETACHED DOMESTIC GARAGE TO REAR OF EXISTING DWELLING
DWELLING HOUSE WITH SEPTIC TANK SYSTEM AND ALL ASSOCIATED SITE WORKS AND PERMISSION FOR DECOMMISSIONING OF THE SEPTIC TANK SYSTEM AND CONNECTION TO THE MAINS SEWER DRAINAGE TOGETHER WITH ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF ASTRO TURF PITCH WITH PERIMETER FENCING AND FLOODLIGHTING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
DEVELOPMENT OF A NEW SEWERAGE PUMPING STATION, RISING MAIN AND GRAVITY SEWER CONSISTING OF: (A) TYPICAL UNDERGROUND STORAGE CHAMBER/TANK, (B) ABOVE GROUND CONTROL KIOSK, MOTOR CONTROL CENTRE (MCC) KIOSK AND WASH WATER KIOSK, (C) TELEMETRY POLE (MAXIMUM 6M IN HEIGHT), (D) PERIMETER PALADIN FENCING (2.4M IN HEIGHT), (E) ACCESS ROAD (4M WIDE) AND INTERNAL VEHICULAR TURNING AREA, (F) WET WELL CHAMBER (27M³), (G) PASSIVE ACTIVATED CARBON FILTERS OVER THE WET WELL CHAMBER FOR VENTILATION, (H) RISING MAIN (APPROXIMATELY 160M IN LENGTH), (I) INLET SEWER, (J) EMERGENCY STORAGE AND OVERFLOW, INCLUDING A NEW HEADWALL AT ST. JOHNSTON STREAM, (K) INLET, WET WELL, VALVE CHAMBERS, AND METER CHAMBER, (L) LIGHTING AND WELFARE FACILITIES. THE PROPOSED DEVELOPMENT WILL SPAN AN AREA OF APPROXIMATELY 2216M2. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
ERECTION OF A SINGLE STOREY EXTENSION TO THE EXISTING SCHOOL COMPRISING TWO CLASSROOMS AND ASSOCIATED ACCOMMODATION FOR SPECIAL NEEDS STUDENTS AND ASSOCIATED EXTERNAL WORKS
CONSTRUCTION OF ONE COMMERCIAL BUILDING, AND ONE RESIDENTIAL BUILDING, THE COMMERCIAL BUILDING IS TO THE FRONT OF THE SITE CONSISTING OF 2 RETAIL PREMISES AND ONE SELF CONTAINED APARTMENT, THE SECOND BUILDING IS A RESIDENTIAL BUILDING TO THE REAR OF SITE CONSISTING OF 4 SELF CONTAINED APARTMENTS AND ALL ANCILLARY WORKS WITH CONNECTION TO ALL EXISTING SERVICES
The brief summarizes the pattern across all 170 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2051811The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief