Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 109 decisions within 5 km, 3 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF 6 NO. GLAMPING PODS WITH ASSOCIATED PARKING AND CONNECTION TO A WASTEWATER TREATMENT SYSTEM & POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A DWELLING HOUSE WITH ON-SITE SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
REVISED HOUSE TYPE IN LIEU OF THAT PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 23/51211, TOGETHER WITH ALL ASSOCIATED SITE WORKS AND SERVICES
CONSTRUCTION OF A DWELLING HOUSE WITH ON-SITE SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A GARAGE/STORAGE SHED AND DEMOLITION OF EXISTING SHED WITH ALL ASSOCIATED SITE WORKS
(1) MOBILE HOME UNTIL BUILDING WORKS ARE COMPLETED AND (2) WORKS TO EXISTING SHED INCLUDING NEW ROOF, RAISING HEIGHT OF ROOF AND INSULATION OF WINDOWS AND PERMISSION FOR (1) RETENTION AND COMPLETION OF EXTENSION TO DWELLING HOUSE AND INCREASE IN HEIGHT OF DWELLING HOUSE AND (2) UPGRADE OF ON-SITE SEWERAGE TREATMENT SYSTEM WITH ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 109 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2051813The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief