Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 130 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONVERSION OF ATTIC AND INTEGRAL GARAGE TO HABITABLE ACCOMMODATION INCLUDING ASSOCIATED SITE WORKS
CONSTRUCTION OF A DWELLING HOUSE WITH AN ON-SITE WASTE WATER TREATMENT SYSTEM
(1) DEMOLITION OF EXISTING DISUSED 160 SQ.M. CHILL STORE (2) ERECTION OF A PROPOSED CLEANER FISH HATCHERY BUILDING ON THE SITE OF THE FORMER CHILL. THE PROPOSED HATCHERY WILL CONSIST OF A 520 SQ.M. PORTAL FRAMED BUILDING WITH A RIDGE HEIGHT OF APPROXIMATELY 4.90M ABOVE THE EXISTING PAVED YARD. THE BUILDING WILL BE FINISHED WITH PROFILED SHEETING, COLOURED GREEN. (3) CONNECTION TO THE EXISTING SEA WATER INTAKE SYSTEM AND UNDERGROUND ELECTRIC POWER SUPPLY (4) INSTALLATION OF A FILTER AND 100 CU.M. SEA WATER HEADER TANK WITH UNDERGROUND GRAVITY PIPEWORK CONNECTION TO NEW HATCHERY (5) INSTALLATION OF WASTE WATER COLLECTION SYSTEM AND PUMPED RISING MAIN WITH FILTRATION UNIT TO THE EXISTING SEA WATER OUTFALL PIPE AT THE NEARBY KINDRUM SMOLT FARM (6) ALL ASSOCIATED SITE SERVICES
SITE DEVELOPMENT WORKS AND PERMISSION FOR CONSTRUCTION OF A DWELLING HOUSE WITH ON-SITE SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) RETENTION OF EXISTING DWELLING AND ACCESS ARRANGEMENTS, (2) EXTENSION/RENOVATION OF EXISTING DWELLING, AND (3) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION/CONNECTION TO NEW WASTEWATER TREATMENT SYSTEM AND INFILTRATION AREA
The brief summarizes the pattern across all 130 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2051878The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief