Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 317 decisions within 5 km, 8 exact-site or onsite candidate records, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) REMOVAL OF EXISTING STORAGE SHEDS (B) CONSTRUCTION OF AN ASTRO TURF PITCH WITH PERIMETER FENCING AND FLOODLIGHTING (C) CONSTRUCTION OF NEW STORAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF FLOOD LIGHTING TO EXISTING FOOTBALL PITCH
CHANGE OF USE OF A SECTION OF THE COMMUNITY CENTRE TO EARLY CHILDCARE FACILITY WITH EXTENDED HOURS INCLUDING CLASSROOM, AND OUTDOOR PLAY AREA WITH SCREEN FENCING AND ASSOCIATED SITE WORKS
CHANGE OF USE OF EXISTING CLASSROOMS (INTERNAL AND EXTERNAL) AND EXTERNAL OPEN SPACE TO REAR OF COMMUNITY CENTRE TO AN EARLY CHILDCARE FACILITY WITH EXTENDED HOURS AND ASSOCIATED SITE WORKS
(1) EXTENSION OF THE EXISTING COMMUNITY GARDEN, (2) DEVELOPMENT OF A NEW CHILDREN'S PLAY PARK, (3) DEMOLITION OF THE EXISTING STORAGE SHED, (4) CONSTRUCTION OF A NEW TWO STOREY BUILDING COMPRISING OF TOILETS AND STORAGE ON THE GROUND FLOOR AND OFFICE SPACE ON THE FIRST FLOOR, (5) CONSTRUCTION OF A NEW STORAGE SHED AND (6) INSTALLATION OF A FREE DRAINING SURFACE AND SOFT LANDSCAPING WITHIN THE REMAINING FIELD, TOGETHER WITH ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CHANGE OF USE FROM EXISTING PAROCHIAL HOUSE TO A COMMUNITY HUB BUILDING AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 317 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2051926The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief