Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 230 decisions within 5 km, 2 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A DWELLING HOUSE WITH ATTACHED GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) ALTERATIONS AND EXTENSIONS TO EXISTING DERELICT TWO STOREY DETACHED HOUSE, (2) REFURBISHMENT AND EXTENSION OF EXISTING DWELLING, (3) CONSTRUCTION OF SINGLE AND TWO STOREY EXTENSIONS TO PROVIDE ENLARGED LIVING ACCOMMODATION, (4) CONNECTION TO SEPTIC TANK, (5) ALTERATIONS TO EXISTING ACCESS ROADWAY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CHANGE OF HOUSE TYPE GRANTED UNDER PLANNING REF 10/20450 AND EXTENDED UNDER REF 15/51414
AMENDMENTS TO APPROVED DWELLING HOUSE & RELOCATION OF THE SAME PREVIOUSLY GRANTED UNDER PLANNING REF 20/50095
CONSTRUCTION OF A SINGLE STOREY DWELLING HOUSE WITH SEPTIC TANK AND PERCOLATION AREA
(1) RETENTION OF A NEW ENTRANCE AND PARTIALLY CONSTRUCTED ROAD TO THE SITE AND (2) ERECTION OF A DWELLING HOUSE WITH ATTACHED DOMESTIC GARAGE AND WASTE WATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 230 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2051998The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief