Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 149 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
ERECTION OF A DWELLING HOUSE WITH CONNECTION TO EXISTING PUBLIC SEWERAGE SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
SERVICE DOOR TO SIDE OF THE EXISTING BUILDING AND PERMISSION FOR (1) CHANGE OF USE FROM EXISTING FORMER PARISH HALL PREMISES TO PROVIDE A NEW TECHNOLOGY HUB CENTRE WITHIN THE EXISTING BUILDING, EXTENDING TO 2NO FLOORS WITH OFFICE CAPACITY, MEETING ROOM FACILITIES, WELFARE FACILITIES, RECEPTION AREAS ETC. (2) CONSTRUCTION OF 1ST FLOOR LEVEL TO PROVIDE FOR ADDITIONAL OFFICE SPACE (3) CONSTRUCTION OF NEW FEATURES GLAZED ENTRANCE LOBBY TO THE SIDE ELEVATION & FIRE DOOR TO THE REAR OF THE EXISTING BUILDING (4) PROVISION OF ADDITIONAL CAR PARKING AREAS, BICYCLE STANDS, PATHWAYS WITHIN THE OPEN SPACE AND BIN STORAGE (5) ERECTION OF SITE SIGNAGE AND CONNECTION TO ALL EXISTING ON SITE SERVICES AND ALL ASSOCITED SITE DEVELOPMENT WORKS
ERECTION OF A TWO STOREY DWELLING HOUSE, CONNECTION INTO PUBLIC SEWER AND CONSTRUCTION OF CAR PARKING SPACE AND A TYPE 113A ENTRANCE ACROSS THE ROAD FROM THE DEVELOPMENT.
ERECTION OF A TWO STOREY DWELLING HOUSE, CONNECTION INTO PUBLIC SEWER AND CONSTRUCTION OF CAR PARKING SPACE AND A TYPE 113A ENTRANCE ACROSS THE ROAD FROM THE DEVELOPMENT.
CONSTRUCTION OF A NEW DISTILLERY COMPLEX CONSISTING OF THE FOLLOWING: (1) A NEW WHISKEY & GIN DISTILLERY BUILDING WITH VISITOR CENTRE AND ASSOCIATED OFFICES, LABS, BOTTLING HALL, BAR TASTING & SHOP AREAS TOGETHER WITH STAFF FACILITIES, (2) EXTERNAL ESB SUB STATION, (3) EXTERNAL COOLING TOWER AND SILO STORAGE TANKS, (4) A NEW VEHICULAR ENTRANCE WITH ASSOCIATED FILTER LANE OFF THE MAIN COUNTY ROAD, WITH INTERNAL ACCESS ROADS AND INTERNAL FOOTPATHS, CAR PARKING AREAS ETC, (5) COOLING AND SURFACE WATER FIRE RETENTION PONDS WITHIN THE SITE AREA, (6) 4 NO. SEPARATE BARREL STORAGE SHEDS, (7) CONSTRUCTION OF A NEW PEDESTRIAN BRIDGE LINKING THE SITE TO THE ARDARA TOWN CAR PARK WITH ASSOCIATED WALKWAYS FROM BRIDGE TO THE DISTILLERY, (8) REDUCTION OF GROUND LEVEL TO LOWER PART OF SITE BY 1M IN DEPTH, (9) REDUCTION OF GROUND LEVEL ALONG THE NORTHERN BOUNDARY, (10) CONNECTION TO EXISTING PUBLIC FOUL SEWER ON SITE, (11) BORE 4 NO. BORED LINED WATER WELLS, WITH AN ASSOCIATED CONNECTION TO THE EXISTING PUBLIC WATER SUPPLY, (12) ERECTION OF ROAD SIDE SIGNAGE AND ASSOCIATED SIGNAGE TO THE DISTILLERY BUILDINGS AND (13) CONSTRUCTION OF 2M HIGH PERIMETER FENCING TO SECURE SITE. A NATURA IMPACT STATEMENT (NIS) WILL FORM PART OF THIS APPLICATION AND IS SUBMIITED TOGETHER WITH ALL ASSOCIATED SITE DEVELOPEMENT & LANDSCAPING WORKS
REMOVAL OF AN EXISTING 15 METRES TELECOMMUNICATIONS POLE TOGETHER WITH ANTENNAS, DISHES, FENCE AND SUPPORTING FIXTURES AND REPLACEMENT WITH A NEW 18 METRES TELECOMMUNICATIONS POLE TOGETHER WITH ANTENNAS, DISHES, SUPPORTING FIXTURES, REMOTE RADIO UNITS (RRU'S) LIGHTING, CONCRETE PLINTH, EXTENSION OF AN EXISTING FENCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS TO PROVIDE FOR HIGH-SPEED WIRELESS DATA AND BROADBAND SERVICES
The brief summarizes the pattern across all 149 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2052007The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief