Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 159 decisions within 5 km, 1 exact-site or onsite candidate record, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) DEMOLITION OF THE EXISTING REAR EXTENSION (2) DECOMMISIONING OF THE EXISTING SEPTIC TANK (3) ERECTION OF NEW FRONT PORCH & ATTACHED DOMESTIC GARAGE / CAR PORT TO THE GABLE END WITH MINOR ALTERATIONS TO ALL FACADES (4) DEVELOPMENT OF EXISTING ATTIC TO PROVIDE FOR LIVING ACCOMMODATION INCORPORATING DORMER WINDOWS TO THE FRONT & REAR ELEVATIONS (5) INSTALLATION OF NEW SEWERAGE TREATMENT SYSTEM (6) ERECTION OF A NEW DETACHED DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CHANGE OF USE FROM RESOURCE CENTRE TO A DWELLING HOUSE WITH CONNECTION TO ALL EXISTING SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A SHED FOR THE PURPOSE OF A THATCHING SCHOOL WITH CONNECTION TO ALL EXISTING SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF AN EXTENSION TO THE REAR OF THE EXISTING DOLMEN CENTRE BUILDING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF 3 NO. CABIN TYPE GLAMPING UNITS FOR SHORT TERM LETTING AND THE INSTALLATION OF A WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION AND REMOVAL OF A MEN'S SHED BUILDING (135M2), (2) CONSTRUCTION OF A NEW SINGLE STOREY LEISURE CENTRE WITH PLANT BASEMENT TO THE NORTH WEST OF THE DOLMEN CENTRE (1330 M2 EXCLUDING PLANT) TO INCLUDE A SWIMMING POOL, CHILDREN'S POOL, TWO STOREY SLIDE, STEAM ROOM, JACUZZI, SAUNA, GYM, MEETING ROOM, OFFICES, STORES, CHANGING AREAS, TOILETS, PLANTROOM AND ALL ASSOCIATED FACILITIES, (3) ALTERATIONS TO THE INTERNAL ROAD AND PARKING LAYOUT TO ACCOMMODATE THE NEW LEISURE CENTRE WITH SITE ENTRANCE TO REMAIN UNCHANGED, (4) ALTERATIONS TO THE EXISTING DOLMEN CENTRE INCLUDING CONVERSION OF A MEETING ROOM INTO AN EXHIBITION/DISPLAY AREA AND CAFÉ AND (5) CONSTRUCTION OF A NEW WASTEWATER TREATMENT PLANT AND EXPANSION OF AN EXISTING REED BED WATER TREATMENT SYSTEM TO CATER FOR POOL WASTEWATER DISCHARGE AND ALL ASSOCIATED SITE DEVELOPMENT AND LANDSCAPING WORKS
The brief summarizes the pattern across all 159 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2052010The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief