Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

GLEBE & KILLYBEGS , KILLYBEGS , DONEGAL POOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

GLEBE & KILLYBEGS , KILLYBEGS , DONEGAL PO

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

8% of nearby decided applications were refused. The site check found 280 decisions within 5 km, 2 exact-site or onsite candidate records, and 12 structured appeals.

Matched source
2052025
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

2 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

12 structured nearby appeal records.

12 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

280Nearby applications
2Site-linked candidates
8%Nearby refused
12Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

2052025

(1) REDUCED LEVEL EXCAVATIONS TO EXISTING ROCK EMBANKMENT, ADDITIONAL TO THAT APPROVED UNDER PERMISSION REF NO. 18/51487, TO FACILITATE FURTHER EXTENSION OF THE BUILDING. THE EXCAVATION WORK INVOLVED MECHANICAL ROCK BREAKING ACTIVITY AND STOCKPILING OF EXCAVATED ROCK MATERIAL ON SITE (2) EXTENSION TO EXISTING FISH PROCESSING FACILITY, ADDITIONAL TO THAT APPROVED UNDER PERMISSION REF: NO. 18/51487, CONSISTING OF GENERAL PRODUCTION AREAS AND ANCILLARY ACCOMMODATION

Granted0.0 km18 February 2021
1851487

(1) REDUCED LEVEL EXCAVATIONS TO EXISTING ROCK EMBANKMENT TO FACILITATE EXTENSION OF THE BUILDING. THE EXCAVATION WORK MAY NECESSITATE ROCK BREAKING USING A CONTROLLED BLASTING TECHNIQUE IN CONJUNCTION WITH MECHANICAL ROCK BREAKING ACTIVITY. THE WORKS WILL NECESSITATE STOCKPILING OF EXCAVATED ROCK MATERIAL ON SITE AND (2) EXTENSIONS TO EXISTING FISH PROECESSING FACILITY CONSISTING OF GENERAL PRODUCTION AREAS AND ANCILLARY ACCOMMODATION

Granted0.0 km13 December 2018
2050435

DESIGN MODIFICATIONS TO BUILDING APPROVED UNDER PERMISSION REF NO. 19/50496 TO INCLUDE (1) REDUCED PARAPET HEIGHT ON MAIN COLD STORE BUILDING (2) RECONFIGURED PLAN LAYOUT OF BUILDING (3) 2 NO. EXTERNAL STEEL STAIRS (4) FIRST FLOOR ACCOMODATION IN MARSHALLING AREA (5) CONVEYOR LINK BETWEEN THE SUBJECT BUILDING AND EXISTING FISH PROCESSING BUILDING AND PERMISSION FOR (1) CONSTRUCTION OF A SINGLE STOREY EXTENSION CONSISTING OF A STORE FOR THE PURPOSE OF STORING FISHING EQUIPMENT (2) SIGNAGE TO BUILDING APPROVED UNDER PLANNING REF NO. 19/50496

Granted0.1 km09 July 2020
1950496

CONSTRUCTION OF A COLD STORAGE BUILDING PLUS A MARSHALLING AND LOADING AREA, ANCILLARY STAFF ACCOMMODATION, A COVERED CONVEYOR SYSTEM AND ALL ASSOCIATED SITE WORKS

Granted0.1 km21 June 2019
2051391

CONSTRUCTION OF A 30 METER MULTI-USER LATTICE MOBILE AND BROADBAND TOWER WITH DELTA HEADFRAME CARRYING TELECOMMUNICATIONS EQUIPMENT, TOGETHER WITH ASSOCIATED EQUIPMENT AND CABINETS ENCLOSED WITHIN A 2.4M PALISADE FENCE COMPOUND

Granted0.2 km19 November 2020
2350163

(1) INSTALLATION OF AN EXTERNAL ABOVE GROUND SALTWATER STORAGE TANK & (2) CONSTRUCTION OF NEW MEZZANINE ACCOMMODATION WITHIN EXISTING PROCESSING BUILDING

Granted0.3 km30 March 2023

The brief summarizes the pattern across all 280 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required