Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 280 decisions within 5 km, 2 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) REDUCED LEVEL EXCAVATIONS TO EXISTING ROCK EMBANKMENT, ADDITIONAL TO THAT APPROVED UNDER PERMISSION REF NO. 18/51487, TO FACILITATE FURTHER EXTENSION OF THE BUILDING. THE EXCAVATION WORK INVOLVED MECHANICAL ROCK BREAKING ACTIVITY AND STOCKPILING OF EXCAVATED ROCK MATERIAL ON SITE (2) EXTENSION TO EXISTING FISH PROCESSING FACILITY, ADDITIONAL TO THAT APPROVED UNDER PERMISSION REF: NO. 18/51487, CONSISTING OF GENERAL PRODUCTION AREAS AND ANCILLARY ACCOMMODATION
(1) REDUCED LEVEL EXCAVATIONS TO EXISTING ROCK EMBANKMENT TO FACILITATE EXTENSION OF THE BUILDING. THE EXCAVATION WORK MAY NECESSITATE ROCK BREAKING USING A CONTROLLED BLASTING TECHNIQUE IN CONJUNCTION WITH MECHANICAL ROCK BREAKING ACTIVITY. THE WORKS WILL NECESSITATE STOCKPILING OF EXCAVATED ROCK MATERIAL ON SITE AND (2) EXTENSIONS TO EXISTING FISH PROECESSING FACILITY CONSISTING OF GENERAL PRODUCTION AREAS AND ANCILLARY ACCOMMODATION
DESIGN MODIFICATIONS TO BUILDING APPROVED UNDER PERMISSION REF NO. 19/50496 TO INCLUDE (1) REDUCED PARAPET HEIGHT ON MAIN COLD STORE BUILDING (2) RECONFIGURED PLAN LAYOUT OF BUILDING (3) 2 NO. EXTERNAL STEEL STAIRS (4) FIRST FLOOR ACCOMODATION IN MARSHALLING AREA (5) CONVEYOR LINK BETWEEN THE SUBJECT BUILDING AND EXISTING FISH PROCESSING BUILDING AND PERMISSION FOR (1) CONSTRUCTION OF A SINGLE STOREY EXTENSION CONSISTING OF A STORE FOR THE PURPOSE OF STORING FISHING EQUIPMENT (2) SIGNAGE TO BUILDING APPROVED UNDER PLANNING REF NO. 19/50496
CONSTRUCTION OF A COLD STORAGE BUILDING PLUS A MARSHALLING AND LOADING AREA, ANCILLARY STAFF ACCOMMODATION, A COVERED CONVEYOR SYSTEM AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A 30 METER MULTI-USER LATTICE MOBILE AND BROADBAND TOWER WITH DELTA HEADFRAME CARRYING TELECOMMUNICATIONS EQUIPMENT, TOGETHER WITH ASSOCIATED EQUIPMENT AND CABINETS ENCLOSED WITHIN A 2.4M PALISADE FENCE COMPOUND
(1) INSTALLATION OF AN EXTERNAL ABOVE GROUND SALTWATER STORAGE TANK & (2) CONSTRUCTION OF NEW MEZZANINE ACCOMMODATION WITHIN EXISTING PROCESSING BUILDING
The brief summarizes the pattern across all 280 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2052025The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief