Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 361 decisions within 5 km, 2 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF A COMMERCIAL STORAGE SHED & RELOCATION OF EXISTING ENTRANCE WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
DABHACH SEARACHAIS LE FREASTAL AR AN TEACH CÓNAITHE ATÁ ANN
(1) CONSTRUCTION OF A PROPOSED SINGLE STOREY ANNEX EXTENSION TO EXISTING HOUSE, (2) AMENDMENTS TO EXISTING WINDOWS AT THE FRONT AND SIDE OF THE HOUSE, (3) NEW WINDOW TO THE EXISTING GABLE AND (4) INTERNAL RENOVATION WORKS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) RENOVATION WORK TO EXISTING HOUSE INTERNALLY, INCLUDING WORKS TO GROUND AND FIRST FLOOR (2) EXTERNAL WORKS TO EACH ELEVATION INCLUDING NEW BI-FOLD DOORS, CANOPY PORCH AND NEW WINDOW CONFIGURATIONS TO FRONT, REAR AND BOTH SIDES OF HOUSE, NEW DORMERS AND VELUX WINDOWS TO FRONT AND BACK ROOFS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
IS ÉARD ATÁ SNA HOIBREACHA ATÁ BEARTAITHE NÁ FEIRM GHRÉINE, INA BHFUIL ACHAR C. 14.1 HEICTEÁR, INA BHFUIL EAGAIR LÍNEACHA DE PHAINÉIL FHÓTAVOLTACHA GHRÉINE AR FHRÁMAÍ AR THALAMH (LE CÁBLÚ AGUS DUCHTÁIL A BHAINEANN LEIS SIN), 1 FOSTÁISIÚN 38 KV AR AN LÁTHAIR, 6 STÁISIÚN INBHÉARTAITHE / TRASFHOIRMEORA STÓRAIS AONAIR, NA CÁBLAÍ LASTUAS LEICTREACHA ATÁ ANN CHEANA FÉIN A CHUR FAOI THALAMH AG TRASNÚ AN TSUÍMH, FÁLÚ SLÁNDÁLA IMLÍNE AGUS GEATAÍ, 2 CHOIMEÁDÁN STÓRÁLA, CCTV, BÓTHAR ROCHTANA NUA, CÓRAS SEALADACH NÍOCHÁIN ROTHA TÓGÁLA AGUS NA HOIBREACHA FORBARTHA COIMHDEACHA UILE A BHAINEANN LEIS. ULLMHAÍODH RÁITEAS TIONCHAIR NATURA (NIS) LEIS
(1) CHANGE OF HOUSE TYPE FROM PREVIOUSLY APPROVED STOREY AND A HALF HOUSE TO A SINGLE STOREY HOUSE (PLANNING REF NO. 24/60007 REFERS) AND (2) MINOR RELOCATION OF HOUSE POSITION TO THE SOUTH WEST OF THE SITE WITH ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 361 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2052041The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief