Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 259 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
GARAGE AND CHANGE OF USE FROM GARAGE TO ANCILLARY ACCOMMODATION TO EXISTING MONTESSORI FACILITY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DETACHED DOMESTIC GARAGE
(1) CONSTRUCTION OF EXTENSION AND RENOVATION OF EXISTING DWELLING HOUSE AND (2) RAISING THE ROOF TO PROVIDE FIRST FLOOR ACCOMMODATION AND ALL ASSOCIATED SITE WORKS
RETENTION OF THE LOCATION AND FINISHED FLOOR LEVEL OF EXISTING DWELLING HOUSE PREVIOUSLY GRANTED UNDER REF:14/50826 AND RETENTION OF LOCATION OF THE ASSOCIATED VEHICULAR ENTRANCE ONTO THE COUNTY ROAD
INSTALLATION OF ELECTRONIC COMMUNICATIONS INFRASTRUCTURE COMPRISING A 12-METRE HIGH LATTICE STRUCTURE SUPPORTING 4NO. DISHES, TOGETHER WITH EQUIPMENT CABINET, PALISADE FENCE AND GATE, FIBRE DUCTING AND CHAMBERS, FOUNDATION AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED
The brief summarizes the pattern across all 259 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2150011The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief