Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,199 decisions within 5 km, 2 exact-site or onsite candidate records, and 62 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
62 structured nearby appeal records.
62 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF PHOTOVOLTAIC PANELS AND ASSOCIATED WORKS ON THE 10 ACRE SITE OF THE EXISTING CAR PARK DIRECTLY OPPOSITE THE EXISTING IT CAMPUS AND CONSISTS OF ERECTION OF 50 DOUBLE PHOTOVOLTAIC PANELS, A 2 METRE FENCE ENCLOSURE, 2 NO. CAR CHARGING STATIONS AND ASSOCIATED CONSUMER SHELTER TO THE REAR OF THE EXISTING CAR PARK
(1) RETENTION OF SINGLE STOREY DISPATCH EXTENSION TO EXISTING WAREHOUSE AND PORTABLE REFRIGERATION ACCOMMODATION AND (2) CONSTRUCTION OF (A) EXTENSION TO THE EXISTING WAREHOUSE TO PROVIDE ADDITIONAL WAREHOUSE SPACE, (B) NEW CHILL ROOM AND FREEZER AND (C) NEW STAFF WELFARE AND OFFICE ACCOMMODATION, EXTENSION OF EXISTING TRUCK YARD AND TURNING, INSTALLATION OF NEW EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CONSTRUCTION OF NEW 27M MULTI-USER TELECOMMUNICATIONS SUPPORT STRUCTURE CARRYING 10 NO. ANTENNAS AND ASSOCIATE REMOTE RADIO UNITS, 5 NO. COMMUNICTION DISHES, 3 NO. LIGHTNING FINIALS AND 10 NO. OUTDOOR CABINETS ALL ENCLOSED WITHIN A SECURITY COMPOUND WITH A 2.4M HIGH PALISADE FENCE WITH 4M ACCESS GATE. SITE ACCESS AND SITE WORKS TO INCLUDE CULVERTING IN PART OF THE EXISTING WATERCOURSE.
CONSTRUCTION OF AN EXTENSION TO THE CURRENT GYM LOCATED IN THE EXISTING ATU SPORTS CENTRE (AN DÁNLANN) AT THE LETTERKENNY CAMPUS. THE EXTENSION WILL BE BUILT ON THE EXTERNAL TERRACE OUTSIDE THE EXISTING GYM AT FIRST FLOOR LEVEL
THE CONSTRUCTION OF A NEW BIOMASS HEATING CENTRE AND 83 SPACE CARPARK AS PART OF THE NORTH WEST REGIONAL SCIENCE PARK PROJECT
RETENTION OF AN ADVERTISEMENT TOTEM SIGN MODIFIED TO BLOCK OUT THE DIGITAL MESSAGING BOARD, LOCATED AT THE ROAD FRONTAGE OF THE ULSTER TYRE PREMISES
The brief summarizes the pattern across all 1,199 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2150545The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief