Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 566 decisions within 5 km, 1 exact-site or onsite candidate record, and 19 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
19 structured nearby appeal records.
19 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
REMOVAL OF THE EXISTING PRE-FABRICATED SCHOOL BUILDINGS AND THE CONSTUCTION OF A NEW TWO STOREY PRIMARY SCHOOL, WITH A GROSS FLOOR AREA OF 2082SQ.METRES TOGETHER WITH ALL ASSOCIATED SITE WORKS, INCLUDING EXTERNAL PLAY AREAS, EXTENDED VEHICULAR SET-DOWN AND SURFACE CAR PARKING AREAS, NEW EMERGENCY ACCESS ROAD FROM THE SCHOOL ONTO THE OLD LAGHEY ROAD AND EXTENSION OF EXISTING PUBLIC FOOTPATH TO SAME; WITH CONNECTIONS TO ALL PUBLIC UTILITIES AND ALTERATIONS AND IMPROVEMENTS TO EXISTING ACCESS AND EGRESS ONTO THE BROOKFIELD ROAD
(A) RETENTION AND COMPLETION OF SPORTS FIELD AND FOR THE CONSTRUCTION OF PEDESTRIAN WALKWAY AND PERIMETER FENCING, (B) CONSTRUCTION OF 6 NO. FLOODLIGHTS TO EXISTING SPORTS FIELD, AND (C) ALL ANCILLARY SITE DEVELOPMENT WORKS
CONSTRUCTION OF A STOREY AND A HALF DOMESTIC GARAGE TO REAR OF THE EXISTING HOUSE COMPRISING OF GARAGE AT GROUND FLOOR AND HOME OFFICE AT FIRST FLOOR WITH POLYCARBONATE CANOPY BETWEEN THE REAR OF THE HOUSE AND THE PROPOSED GARAGE AND ALL ASSOCIATED SITE WORKS
RETENTION & COMPLETION OF (1) ERECTION OF (A) AN INDUSTRIAL STORAGE SHED (B) A 0.33 ACRE EXTENSION TO THE AUTHORIZED STORAGE DEPOT YARD (C) FENCING OF THE PERIMETER OF THE UNAUTHORIZED YARD EXTENSION (D) A 22.5M LONG CONCRETE RETAINING WALL WITH A HEIGHT GREATER THAN 2M (E) A SCAFFOLDING STORE (2) RAISING OF GROUND LEVELS WITHIN THE AUTHORIZED YARD EXTENSION (3) THE REMOVAL OF A SOIL BANK LEVEE AND ITS REPLACEMENT WITH LOWER ROCK ARMOUR AND PERMISSION FOR (1) DEMOLITION OF EXISTING AGRICULTURAL SHED (2) PROVISION OF NEW ACCESS ARRANGEMENTS TO SITE TO INCLUDE REALIGNMENT OF EXISTING ACCESS ROAD, PROPOSED NEW SECURITY FENCING AND ACCESS GATES (3) PROVISION OF STORM ATTENUATION SYSTEM (4) REPROFILING OF EXISTING SITE CONTOURS TOWARDS ADJACENT WATERCOURSE (5) PROVISION OF ADDITIONAL CARPARKING AND ALL ASSOCIATED SITE WORKS
COMPLETION AND TO AMEND HOUSING DEVELOPMENT, COMPRISING OF 38NO. UNITS, AS PREVIOUSLY GRANTED UNDER AN BORD PLEANALA REF: 05.217193 AND PLANNING REFERENCES 05/20490 AND 16/50376. THE DEVELOPMENT WILL CONSIST OF THE FOLLOWING AMENDMENTS AND WORKS: (1) A REVISED SITE AND ROAD LAYOUT PLAN (2) 1NO. DETACHED BUNGALOW (3) 2NO. SEMI-DETACHED BUNGALOWS (4) 16NO. SEMI-DETACHED TWO STOREY HOUSES (5) 18NO. APARTMENTS WITHIN 5NO TWO STOREY BLOCKS (6) 1NO. SINGLE STOREY DETACHED CRÉCHE BUILDING (7) DEMOLITION OF EXISTING PARTIALLY CONSTRUCTED HOUSE (8) ASSOCIATED SITE WORKS AND CONNECTION TO ALL SITE AND PUBLIC SERVICES
ERECTION OF A TWO BEDROOM BUNGALOW IN LIEU OF PREVIOUSLY APPROVED CRÉCHE BUILDING GRANTED PERMISSION UNDER AN BORD PLEANALA, REF 05.217193 AND PLANNING REFERENCES 05/20490 AND 16/50376 ON SITE NO. 2 OAK MEADOWS
The brief summarizes the pattern across all 566 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2150619The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief