Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 298 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CARRYING OUT WORKS TO BINN BHUÍ PATHWAY WHICH WILL INCLUDE ADDITIONAL PATHS, SURFACE RENEWAL OF PATHWAYS, REPAIRS AND UPGRADING AND ASSOCIATED SITE WORKS (NIS INCLUDED)
INSTALLATION OF A 12-METRE STOUT WOODEN UTILITY POLE WITH 1 NO. RECEIVING DISH, A GROUND-LEVEL SINGLE BAY CABINET, 1.2-METRE HIGH MESH FENCE, FIBRE CHAMBER (0.6X0.6M), CONCRETE PLINTH AND TRUNKING COVER FOR DUCT EXIT AND CABLE RUN UP POLE TO 3-METRES. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND SUBMITTED IN SUPPORT OF THIS PLANNING APPLICATION
SÍNEADH A CHUIR LEIS AN SEID STÓRALA ATA ANN CHEANNA FÉIN A BHÍ CEADDAITHE FAOÍ UIMHIR TAGRATHA 07/31268 LE GACH SAOTHAR FORBARTHA LÁITHREÁIN GAOLMHAR EILE
ALTERATIONS AND ERECTION OF (A) AN EXTENSION TO EXISTING DWELLING HOUSE CONSISTING OF A SUN ROOM AND UTILITY ROOM (b) A GARAGE INCLUDING ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
TEACH CÓNAÍ A LEAGAN, TEACH ÚR CÓNAÍ, CÓRAS CÓIREÁLA SÉARCHAIS AGUS ACHAR SÍOTHLAITHE A THÓGÁIL, AGUS BEALACH ÚR ÁISE AGUS OIBREACHA SUÍMH A DHÉANAMH.
ALTERATIONS AND EXTENSION TO EXISTING DWELLING HOUSE CONSISTING OF AN ENLARGEMENT OF KITCHEN AREA, SUNROOM AND SNUG AND ALL ASSOCIATED SITEWORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
The brief summarizes the pattern across all 298 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2151050The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief