Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,193 decisions within 5 km, 2 exact-site or onsite candidate records, and 66 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
66 structured nearby appeal records.
66 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RETENTION & COMPLETION OF CONSTRUCTION OF NEW HGV ENTRANCE ONTO ROAD NO. L-1016-0 TO SERVICE EXISTING FACTORY INCLUDING NEW ENTRANCE GATES & BOUNDARY FENCING & ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A NEW THREE STOREY EXTENSION PROVIDING NEW OFFICE ACCOMMODATION, NEW CANTEEN, MULTIPURPOSE AREAS, TOILET AND ANCILLARY ACCOMMODATION, ADDITIONAL PARKING PROVISION AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A CRECHE FACILITY COMPRISING OF: (1) 2 STOREY BUILDING C.1087M², (2) EXTENSION OF EXISTING ACCESS ROAD, (3) CAR PARKING, (4) OUTDOOR PLAY AREAS, (5) STORM WATER ATTENUATION TANK AND (6) CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A TWO-STOREY EXTENSION TO THE EXISTING 3 STOREY NORTH EASTERN GABLE OF THE EXISTING PRIMARY SCHOOL BUILDING, ALLOWING FOR MODIFICATIONS TO THE EXISTING EXIT DOOR AND GLAZING TO FACILITATE A CONNECTION TO THE PROPOSED EXTENSION WHICH WILL CONSIST OF 4 NO. GENERAL CLASSROOMS, LIBRARY AND STAFF ROOM INCLUDING ALL RELATED PLANT AREAS AND SERVICE RISERS WITH PROPOSED SITE WORKS TO INCLUDE CHANGES TO THE INTERNAL ROAD LAYOUT AND BUS SETTING DOWN AREA, SITE SERVICES AND DRAINAGE, PUBLIC LIGHTING, LANDSCAPING AND ALL ANCILLARY SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF AN ISLAMIC CULTURAL CENTRE TO INCLUDE THE FOLLOWING: (A) PROVISION OF MAIN BUILDING A - CONSISTING OF GROUND FLOOR AND FIRST FLOOR MEZZANINE PRAYER HALL AREAS (MALE / FEMALE), A COFFEE DOCK / SANDWICH BAR AREA WITH ALL ASSOCIATED ANCILLARY SPACES (ENTRANCE LOBBIES / FOYER / CIRCULATION SPACES / STAIRWELLS / LIFT / OFFICES / MEETING ROOM / LIBRARY-TEACHING ROOM / MALE AND FEMALE TOILETS / KITCHENETTE / PLANT ROOM/STORAGE AND (B) PROVISION OF AUXILIARY BUILDING B - CONSISTING OF A MULTIPURPOSE RECREATIONAL ACTIVITY AREA WITH ALL ASSOCIATED ANCILLARY SPACES (ENTRANCE FOYER, MALE/FEMALE TOILETS, KITCHENETTE, PLANT ROOM, STORAGE), (2) CONSTRUCTION OF AN ACCESS ROAD, FOOTPATHS, CAR PARKING / BICYCLE RACK WITH ALL ASSOCIATED RETAINING STRUCTURES, SITE WORKS, LANDSCAPING, BIN ENCLOSURE AND SERVICES, (3) CONNECTION TO THE EXISTING PUBLIC SEWER, SURFACE WATER DRAINAGE AND WATER MAINS SERVICES AND (4) CARRYING OUT ALTERATIONS TO THE PUBLIC ROAD LAYOUT TO ACCOMMODATE A TRAFFIC TURN OFF LANE
828 SQUARE METRES OF SOLAR PV (PHOTO VOLTAIC) AND ANCILLARY DEVELOPMENT WORKS
The brief summarizes the pattern across all 1,193 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2151302The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief