Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 200 decisions within 5 km, 5 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A MOBILE HOME AND EXCAVATION WORKS CARRIED OUT AT THE SITE AND PERMISSION FOR THE ERECTION OF A DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA, ENTRANCE GATES AND PIERS AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF DWELLING HOUSE WITH AN ON-SITE SEWAGE TREATMENT SYSTEM
EXISTING EXTENSION CONSISTING OF ENCLOSED SEATING AREA
ALTERATIONS & EXTENSION TO EXISTING DWELLING
FUNNEOIGAÍ ÚRA A CHUIR AR AN TEACH CÓNAITHE
A GARAGE TYPE STRUCTURE USED FOR DOMESTIC PURPOSES ONLY
The brief summarizes the pattern across all 200 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2151315The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief