Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 197 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF AN EXTENSION TO THE FRONT OF DWELLING HOUSE WITH ALL OTHER ASSOCIATED DEVELOPMENT WORKS
ERECTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE AND SEWAGE TREATMENT PLANT
(1) ATTIC SPACE WITHIN NEW HIPPED ROOF (2) 2 NO VELUX ROOF LIGHT WINDOWS IN THE ATTIC SPACE TO REAR OF NEW HIPPED ROOF (3) EXTENSION OF EXISTING CHIMNEY STACK INTO ATTIC SPACE AND ABOVE RIDGE HEIGHT OF NEW HIPPED ROOF AND PERMISSION FOR CONSTRUCTION OF A NEW HIPPED ROOF ABOVE ORIGINAL FLAT ROOF OF EXISTING DWELLING HOUSE
ERECTION OF NEW DOMESTIC GARAGE TO REAR OF EXISTING DWELLING HOUSE
(1) DEMOLITION OF EXISTING (DEFECTIVE/MICA) DWELLING HOUSE, (2) DECOMMISSIONING OF EXISTING SEWAGE TREATMENT PLANT AND (3) RECONSTRUCTION OF A NEW REPLACEMENT DWELLING HOUSE AND CONNECTION TO NEW SEWAGE TREATMENT PLANT
(1) INSTALLATION OF A TWO-STOREY MODULAR BUILDING CONTAINING 7 NO. CLASSROOMS, 3 NO. SET ROOMS AND ANCILLARY ACCOMMODATION (2) A NEW SECTION OF FOOTPATH AND PEDESTRIAN CROSSING WITHIN THE SCHOOL GROUNDS (3) CONNECTION TO EXISTING STORM AND FOUL DRAINAGE AND ALL ASSOCIATED WORKS AND SITE WORKS
The brief summarizes the pattern across all 197 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2151385The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief