Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
0% of nearby decided applications were refused. The site check found 9 decisions within 5 km, 7 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
SCIOBAL NA BHFEAR A BHUNÚ A AOI UIMHIR TAG 20/51479 A ATHRÚ GO IONAD NUALAÍOCHTA /SCIOBÓL NA BHFRAR AR AN SUIOMH SEO I MBAILE FEARAINN
INSTALLATION OF ELECTRONIC COMMUNICATIONS INFRASTRUCTURE COMPRISING OF A 12M HIGH LATTICE STRUCTURE SUPPORTING 4 NO. DISHES, TOGETHER WITH EQUIPMENT CABINET, PALISADE FENCE AND GATE, FIBRE DUCTING AND CHAMBERS, FOUNDATION AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED
SCIOBAL NA BHFEAR A BHUNÚ AR AN SUIOMH SEO I MBAILE FEARAINN
IONAD ATHCHÚRSÁLA A THÓGÁIL
GAILEARAÍ DIXON A LEAGAINT AGUS GAILEARAÍ ÚR A THÓGÁIL LE ÁIT CÓNAITHE EALANTÓIR AR AN CHÉAD URLÁR AGUS CORÁS EISILTEACH SEARACHAIS LE SCAGAIRE SNASAIREACHT A THÓGAIL. TÁ RÁITEAS TIONCHAR NATURA ISTIGH LEIS AN T-IARRATAS SEO
DHA SHEOMRA RANGA, LETHRISI AGUS FORHALL A THOGAIL MAR MEADU AR CHUN NA SCOILE, TA ATHRAITHE MOLTA AR NMA SEOMRA ATA ANN CHEANNA, FOSTA BEIDH CORAS UR SEARCHAIS LE TOGAIL AR THALAMH NA SCOILE. TA RAITEAS TIONCHARA NATURA LEIS AN T-IARRATAS
The brief summarizes the pattern across all 9 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2151572The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief