Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,199 decisions within 5 km, 6 exact-site or onsite candidate records, and 64 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
64 structured nearby appeal records.
64 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
(1) ERECTION OF A FALL-ARREST HANDRAIL AND GUARDING TO FLAT ROOFED AREAS (2) INSTALLATION OF PHOTO-VOLTAIC PANELS AND PLANT WITH ASSOCIATED DUCTWORK TO AN AREA OF THE FLAT ROOF
THE CONSTRUCTION OF A NEW BIOMASS HEATING CENTRE AND 83 SPACE CARPARK AS PART OF THE NORTH WEST REGIONAL SCIENCE PARK PROJECT
CONSTRUCTION OF 2 NO. SMALL EXTENSIONS TO THE EXISTING MAIN CAMPUS BUILDING, BUILT ON 2 EXTERNAL TERRACES TO PROVIDE 2 NO. ADDITIONAL CLASSROOMS
CONSTRUCTION OF A NEW ENTRANCE LOBBY TO THE EXISTING REAR ENTRANCE OF THE MAIN LYIT CAMPUS BUILDING INCLUDING NEW RAMPED ACCESS WITH COMPLIMENTARY STEPS AND CONSTRUCTION OF A ROOF TO THE EXISTING OIL TANKS ENCLOSURE LOCATED AT THE REAR OF THE MAIN CAMPUS BUILDING
REFURBISHMENT WORKS TO HARMON HOUSE - A BUNGALOW THAT FACES ON TO THE BALLYRAINE ROAD, TO INCLUDE (1) DEMOLITION OF EXISTING LEAN-TO GARAGE AND ERECTION OF A NEW EXTENSION IN THAT LOCATION INSTEAD AND (2) CHANGE OF USE FROM A DWELLING TO ADDITIONAL STAFF OFFICE AND TEACHING SPACE FOR THE ATLANTIC TECHNOLOGICAL UNIVERSITY
CONSTRUCTION OF AN EXTENSION TO THE CURRENT GYM LOCATED IN THE EXISTING ATU SPORTS CENTRE (AN DÁNLANN) AT THE LETTERKENNY CAMPUS. THE EXTENSION WILL BE BUILT ON THE EXTERNAL TERRACE OUTSIDE THE EXISTING GYM AT FIRST FLOOR LEVEL
The brief summarizes the pattern across all 1,199 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2151850The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief