Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,199 decisions within 5 km, 6 exact-site or onsite candidate records, and 64 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
64 structured nearby appeal records.
64 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) ERECTION OF A FALL-ARREST HANDRAIL AND GUARDING TO FLAT ROOFED AREAS (2) INSTALLATION OF PHOTO-VOLTAIC PANELS AND PLANT WITH ASSOCIATED DUCTWORK TO AN AREA OF THE FLAT ROOF
THE CONSTRUCTION OF A NEW BIOMASS HEATING CENTRE AND 83 SPACE CARPARK AS PART OF THE NORTH WEST REGIONAL SCIENCE PARK PROJECT
CONSTRUCTION OF 2 NO. SMALL EXTENSIONS TO THE EXISTING MAIN CAMPUS BUILDING, BUILT ON 2 EXTERNAL TERRACES TO PROVIDE 2 NO. ADDITIONAL CLASSROOMS
CONSTRUCTION OF A NEW ENTRANCE LOBBY TO THE EXISTING REAR ENTRANCE OF THE MAIN LYIT CAMPUS BUILDING INCLUDING NEW RAMPED ACCESS WITH COMPLIMENTARY STEPS AND CONSTRUCTION OF A ROOF TO THE EXISTING OIL TANKS ENCLOSURE LOCATED AT THE REAR OF THE MAIN CAMPUS BUILDING
REFURBISHMENT WORKS TO HARMON HOUSE - A BUNGALOW THAT FACES ON TO THE BALLYRAINE ROAD, TO INCLUDE (1) DEMOLITION OF EXISTING LEAN-TO GARAGE AND ERECTION OF A NEW EXTENSION IN THAT LOCATION INSTEAD AND (2) CHANGE OF USE FROM A DWELLING TO ADDITIONAL STAFF OFFICE AND TEACHING SPACE FOR THE ATLANTIC TECHNOLOGICAL UNIVERSITY
CONSTRUCTION OF AN EXTENSION TO THE CURRENT GYM LOCATED IN THE EXISTING ATU SPORTS CENTRE (AN DÁNLANN) AT THE LETTERKENNY CAMPUS. THE EXTENSION WILL BE BUILT ON THE EXTERNAL TERRACE OUTSIDE THE EXISTING GYM AT FIRST FLOOR LEVEL
The brief summarizes the pattern across all 1,199 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2151850The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief