Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 410 decisions within 5 km, 5 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) DEMOLITION OF EXISTING DWELLING HOUSE AND DOMESTIC SHED (2) CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE WITH INTEGRAL GARAGE (3) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF A REPLACEMENT SEPTIC TANK / SEWAGE TREATMENT SYSTEM (4) DEVELOPMENT OF AN INDEPENDENT ACCESS ROAD TO SERVICE NEIGHBOURING DWELLING HOUSE AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) ALTERATIONS TO THE ROOF DORMER AND INSTALLATION OF TWO ROOF-LIGHT WINDOWS TO THE FRONT ELEVATION OF THE DWELLING HOUSE, (2) CONSTRUCTION OF A ROOF-DORMER STRUCTURE TO FACILITATE EXTENSION TO THE FIRST FLOOR BEDROOMS TO THE BACK ELEVATION OF THE DWELLING HOUSE, (3) CONSTRUCTION OF RAISED TIMBER DECK AREA AT GROUND FLOOR LEVEL OF THE DWELLING HOUSE TO THE BACK ELEVATION OF THE DWELLING HOUSE, (4) INSTALLATION OF WASTEWATER TREATMENT SYSTEM IN THE BACK GARDEN OF THE DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
GARÁISTE
CONSTRUCTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM, INTERMITTENT SAND FILTER AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A DWELLING HOUSE WITH AN ON-SITE SEWAGE TREATMENT SYSTEM
CONSTRUCTION OF A 1.5 STOREY DWELLING HOUSE WITH SINGLE-STOREY ANNEXE, WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA, ENTRANCE AND ANCILLARY SITE WORKS
The brief summarizes the pattern across all 410 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2151871The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief