Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 153 decisions within 5 km, 1 exact-site or onsite candidate record, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A DWELLING HOUSE AND SEPTIC TANK
(1) DEMOLITION OF EXISTING 7SQM ANNEX TO REAR OF DWELLING UNIT (2) CONSTRUCTION OF A SINGLE STORY 86SQM EXTENSION WITH ALL ASSOCIATED SITE WORKS
ERECTION OF A DWELLING HOUSE WITH SEWAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF DWELLING HOUSE WITH ASSOCIATED SEWAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A CAMPER VAN PARK CONSISTING OF THE FOLLOWING: (1) 10 NO. CAMPER VAN PARKING BAYS WITH ASSOCIATED SERVICES, (2) INTERNAL PATHWAYS, LANEWAYS AND ADDITIONAL PARKING AREAS, (3) PLAY AREA AND PICNIC BENCHES WITHIN GREEN AREAS, (4) SERVICE BUILDING CONTAINING SHOWERS / TOILETS / RECEPTION AREA ETC., (5) INSTALLATION OF NEW ON-SITE SEWAGE TREATMENT SYSTEM AND PERCOLATION AREA AND (6) PROPOSED NEW SIGNAGE BOARD AT ENTRANCE TO SITE TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A NEW DWELLING HOUSE, WASTE WATER TREATMENT SYSTEM, PERCOLATION AREA AND ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 153 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2151966The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief