Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 160 decisions within 5 km, 5 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
ERECTION OF A SHED FOR THE PURPOSE OF A THATCHING SCHOOL WITH CONNECTION TO ALL EXISTING SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF AN EXTENSION TO THE REAR OF THE EXISTING DOLMEN CENTRE BUILDING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION AND REMOVAL OF A MEN'S SHED BUILDING (135M2), (2) CONSTRUCTION OF A NEW SINGLE STOREY LEISURE CENTRE WITH PLANT BASEMENT TO THE NORTH WEST OF THE DOLMEN CENTRE (1330 M2 EXCLUDING PLANT) TO INCLUDE A SWIMMING POOL, CHILDREN'S POOL, TWO STOREY SLIDE, STEAM ROOM, JACUZZI, SAUNA, GYM, MEETING ROOM, OFFICES, STORES, CHANGING AREAS, TOILETS, PLANTROOM AND ALL ASSOCIATED FACILITIES, (3) ALTERATIONS TO THE INTERNAL ROAD AND PARKING LAYOUT TO ACCOMMODATE THE NEW LEISURE CENTRE WITH SITE ENTRANCE TO REMAIN UNCHANGED, (4) ALTERATIONS TO THE EXISTING DOLMEN CENTRE INCLUDING CONVERSION OF A MEETING ROOM INTO AN EXHIBITION/DISPLAY AREA AND CAFÉ AND (5) CONSTRUCTION OF A NEW WASTEWATER TREATMENT PLANT AND EXPANSION OF AN EXISTING REED BED WATER TREATMENT SYSTEM TO CATER FOR POOL WASTEWATER DISCHARGE AND ALL ASSOCIATED SITE DEVELOPMENT AND LANDSCAPING WORKS
AUXILIARY SITE WORKS AND PERMISSION FOR ERECTION OF A DOMESTIC EXTENSION TO THE REAR OF EXISTING DWELLING HOUSE AND CONSTRUCTION OF A DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CHANGE OF USE FROM RESOURCE CENTRE TO A DWELLING HOUSE WITH CONNECTION TO ALL EXISTING SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF THE EXISTING REAR EXTENSION (2) DECOMMISIONING OF THE EXISTING SEPTIC TANK (3) ERECTION OF NEW FRONT PORCH & ATTACHED DOMESTIC GARAGE / CAR PORT TO THE GABLE END WITH MINOR ALTERATIONS TO ALL FACADES (4) DEVELOPMENT OF EXISTING ATTIC TO PROVIDE FOR LIVING ACCOMMODATION INCORPORATING DORMER WINDOWS TO THE FRONT & REAR ELEVATIONS (5) INSTALLATION OF NEW SEWERAGE TREATMENT SYSTEM (6) ERECTION OF A NEW DETACHED DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 160 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2152143The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief