Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 43 decisions within 5 km, 3 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
COMPLETE RENOVATION, WITH NEW ROOF TO ACCOMMODATE A MEZZANINE LOFT AREA REPLACING THE EXISTING ROOF, EXTERNAL INSULATION AND LEAN-TO EXTENSION WITH SOLAR PANELS TO REUSE THE EXISTING COTTAGE AS A SINGLE DWELLING HOUSE WITH A NEW WASTEWATER TREATMENT PLANT, POLISHING FILTER/PERCOLATION AREA AND DOMESTIC WELL
(1) DEMOLITION OF A DWELLING HOUSE DUE TO STRUCTURAL INSTABILITY (2) ERECTION OF A REPLACEMENT HOUSE WITH A CHANGE OF HOUSE TYPE TO THAT PREVIOUSLY APPROVED UNDER REF: 21/52183
ERECTION OF AN EXTENSION AND REFURBISHMENT OF EXISTING DWELLING HOUSE AND INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF 24 METER MULTI-USER LATTICE TOWER WITH HEADFRAME CARRYING TELECOMMUNICATIONS EQUIPMENT, TOGETHER WITH ASSOCIATED EQUIPMENT AND CABINETS ENCLOSED WITHIN A 2.4M PALISADE FENCE COMPOUND WITH ACCESS TRACK
CONSTRUCTION OF A 25 METER ARTIFICAL PINE TREE, MULTI-USER TELECOMMUNICATIONS SUPPORT STRUCTURE SOLUTION CARRYING TELECOMMUNICATIONS EQUIPMENT, TOGETHER WITH ASSOCIATED EQUIPMENT AND CABINETS ENCLOSED WITHIN A 2.4M PALISADE FENCE COMPOUND WITH ACCESS TRACK. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
EXTENSION AND REFURBISHMENT OF EXISTING COMMUNITY CENTRE AND UPGRADE OF THE EXISTING WASTE WATER TREATMENT SYSTEM WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 43 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2152183The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief