Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 143 decisions within 5 km, 2 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF EXTENSIONS TO THE FRONT AND SIDE OF EXISTING DWELLING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF EXTENSION AND RENOVATION OF EXISTING DWELLING HOUSE WITH ALTERATIONS TO ALL FACADES, (2) INCREASE OF EXISTING RIDGE HEIGHT, (3) DISCONNECTION FROM EXISTING SHARED TREATMENT SYSTEM AND INSTALLATION OF A NEW STANDALONE TREATMENT SYSTEM, (4) ERECTION OF A DOMESTIC GARAGE WITH OFFICE SPACE, (5) CONSTRUCTION OF A STUDIO/GRANNY FLAT WITH CONNECTION TO PROPOSED SEWAGE TREATMENT SYSTEM AND (6) DECOMMISSIONING OF EXISTING VEHICULAR ENTRANCE TO THE NORTH OF THE SITE AND CONSTRUCTION OF A NEW VEHICULAR ENTRANCE TO THE SOUTH OF THE SITE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
PROVISION OF 1 NO. ADDITIONAL SERVICED MOBILE HOME WITH HARDSTAND AT THE SOUTHERN END OF THE EXISTING CARAVAN PARK
THE UPGRADE/RENEWAL OF FOUL DRAINAGE INFRASTRUCTURE INCLUDING THE REPLACEMENT OF A DATED AND DYSFUNCTIONAL SEPTIC TANK WITH A PACKAGED PROPRIETARY WASTE WATER SEWERAGE TREATMENT PLANT, PROVISION OF A PUMPED RISING MAIN TO A PERCOLATION AREA (NONE PREVIOUSLY PROVIDED) AND PART RENEWAL OF DRAINAGE NETWORK WITH ASSOCIATED SITE-WORKS AND REMOVAL OF ONE NO. MOBILE HOME
1 NO. RELOCATED SERVICED MOBILE HOME HARD STAND COMPLETE WITH MOBILE HOME
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM AND DOMESTIC GARAGE. A NATURA IMPACT STATEMENT (NIS) WILL FORM PART OF THIS APPLICATION AND WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 143 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2152186The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief