Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,229 decisions within 5 km, 1 exact-site or onsite candidate record, and 66 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
66 structured nearby appeal records.
66 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF TEA ROOMS AND SOCIAL AREA INCLUDING SENSORY ROOM, SENSORY GARDEN, MULTI PURPOSE CHANGING ROOM, TOILETS TO WHICH THE PUBLIC WILL HAVE ACCESS TO WITH DISABILITY ACCESS TO ALL AREAS FROM THE BERNARD MCGLINCHEY TOWN PARK. WORKS ARE IN CLOSE PROXIMITY TO PROTECTED STRUCTURE REF NO: 40500012
DEMOLITION AND REINSTATEMENT OF AN EXISTING DILAPIDATED PORTE COCHERE TO THE MAIN ENTRANCE OF TIR CONAILL HOUSE WHICH IS LOCATED WITHIN THE CURTILAGE OF ST. CONAL’S HOSPITAL (PROTECTED STRUCTURE RPS REF. NO. 40500012)
DEVELOPMENT OF A NEW GAS STORAGE COMPOUND WITH ASSOCIATED TANKS, HARD-STANDING TO ACCOMMODATE ACCESS BY ARTICULATED LORRY, PROPOSED RC WALLS AND SECURITY FENCING, PROPOSED CIVIL WORKS INCLUDING ATTENUATION TANK AND HYDROCARBON INTERCEPTOR ASSOCIATED WITH THE HARDSTANDING AND ALL ASSOCIATED SITE WORKS AND INFRASTRUCTURE
CONSTRUCTION OF A SINGLE STOREY EXTENSION AT THE FORMER A&E ENTRANCE TO ACCOMMODATE A NEW PHYSIOTHERAPY UNIT AND OCCUPATIONAL THERAPY UNIT LOCATED ALONG THE EAST SIDE OF THE CAMPUS AND ALL ASSOCIATED WORKS AND SITE WORKS INCLUDING CONNECTION TO EXISTING FOUL AND STORM DRAINAGE
(1) CONSTRUCTION OF (A) A SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING CDM HUB BUILDING (B) ADDITIONAL CAR PARKING SPACES (C) NEW STEPS AND RAMP ACCESS FROM LOWER CAR PARK (D) EXTERNAL BIN STORE (2) DEMOLITION OF AN EXISTING OUTBUILDING (3) RELOCATION OF EXISTING OIL TANK AND ALL ASSOCIATED WORKS AND SITE WORKS INCLUDING CONNECTION TO EXISTING FOUL AND STORM DRAINAGE
(A) PROVISION OF 2NR. NEW GAS STORAGE COMPOUNDS WITH ASSOCIATED HARD-STANDINGS, WALLS, STRUCTURES AND SECURITY FENCING, (B) 1NR. 5.6MSQ VAPORIZER PLANT ROOM AND ALL ASSOCIATED SITE WORKS AND INFRASTRUCTURE
The brief summarizes the pattern across all 1,229 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2152358The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief