Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 266 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF A DOMESTIC GARAGE AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
(1) EXTENSION TO THE REAR OF EXISTING HOUSE, (2) DETACHED GARAGE TO THE FRONT OF HOUSE AND (3) ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A TIMBER STRUCTURE GAZEBO WITH NECESSARY SITE WORKS
DEMOLITION OF EXISTING OUTHOUSE AND REPLACEMENT WITH A NEW EXTENDED BUILDING TO ACCOMMODATE A COFFEE SHOP/LIGHT FOOD BAR WITH KITCHEN AND TOILET FACILITIES. INSTALLATION OF A SEPTIC TREATMENT SYSTEM AND CAR PARK WITH ALL ASSOCIATED DRAINAGE AND SITE WORKS
(1) DEMOLITION OF EXISTING OUTHOUSE AND REPLACEMENT WITH A NEW EXTENDED BUILDING TO ACCOMMODATE A COFFEE SHOP/LIGHT FOOD BAR WITH KITCHEN AND TOILET FACILITIES (2) INSTALLATION OF A SEPTIC TREATMENT SYSTEM AND CAR PARK WITH ALL ASSOCIATED DRAINAGE AND SITE WORKS
ERECTION OF 12 NO. PODS UNITS WITH WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER TOGETHER WITH SERVICE BUILDINGS, PARKING & PATHWAYS WITH ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION
The brief summarizes the pattern across all 266 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2152608The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief