Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 440 decisions within 5 km, 5 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE EXISTING DWELLING, CONNECTION TO EXISTING SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A VEHICULAR ENTRANCE, ACCESS ROADWAY AND ASSOCIATED SITE WORKS IN LIEU OF THAT PERMITTED TO SERVICE DWELLING HOUSE PREVIOUSLY APPROVED AND UNDER CONSTRUCTION UNDER PLANNING REF 14/51438
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS AND DECOMMISSIONING OF AN EXISTING SEPTIC TANK WITHIN THE SITE BOUNDARY AND RELOCATION AND REPLACEMENT WITH A SEPTIC TANK/ SEWAGE TREATMENT SYSTEM
RETENTION AND COMPLETION OF DWELLING HOUSE PREVIOUSLY APPROVED UNDER PLANNING REF:14/51438 AND ASSOCIATED SITE DEVELOPMENT WORKS
DEVELOPMENT OF A DETACHED MODULAR STRUCTURE TO USE AS A DOG GROOMING STUDIO, INSTALLATION OF A SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
(A) CONSTRUCTION OF EXTENSION AND RENOVATION WORKS TO EXISTING DWELLING HOUSE, WORKS SHALL INCLUDE PROVISION OF A NEW PITCHED ROOF OVER THE EXISTING AND PROPOSED EXTENSION AREA, (B) DECOMMISSIONING EXISTING SEPTIC TANK AND INSTALLTION OF A NEW SEPTIC TANK/SEWAGE TREATMENT AND ASSOCIATED PIPEWORK AND (C) CLOSE EXISTING VEHICULAR ENTRANCE AND CONSTRUCTION OF A NEW VEHICULAR ENTRANCE AND ALL ANCILLARY SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 440 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250112The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief