Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 37 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) REMOVAL OF EXISTING TEMPORARY PORTACABIN ACCOMMODATION FROM 2 LOCATIONS WITHIN THE SITE AT THE SOUTHWEST SIDE AND THE NORTHEAST SIDE OF THE SCHOOL (2) CONSTRUCTION OF AN EXTENSION IN 2 PARTS CONSISTING OF (A) A 2 STOREY EXTENSION LOCATED AT THE SOUTHWEST CORNER OF THE EXISTING SCHOOL CONTAINING AN ENGINEERING ROOM AT GROUND FLOOR WITH A SINGLE STOREY STORE AND A HOME ECONOMICS ROOM AT FIRST FLOOR LEVEL WITH AN ANCILLARY ACCOMMODATION AND CIRCULATION, WITH THE INSTALLATION OF ROOF MOUNTED PV PANELS ON THE ROOF OF THIS PART OF THE EXTENSION (B) A SINGLE STOREY EXTENSION LOCATED AT THE NORTHEASTERN SIDE OF THE SCHOOL, CONTAINING A MUSIC ROOM AND A NEW ENTRANCE TO THE SCHOOL ALONG WITH ASSOCIATED CIRCULATION (3) CONNECTION INTO EXISTING SEWERAGE AND DRAINAGE SYSTEMS (4) ALL SITEWORKS ASSOCIATED WITH THE DEVELOPMENT
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE SIDE AND REAR OF THE EXISTING SINGLE STOREY DWELLING HOUSE TO INCLUDE A FAMILY FLAT FOR USE ANCILLARY TO THE DWELLING HOUSE, ASSOCIATED ALTERATIONS TO THE EXISTING DWELLING ALL WITH ASSOCIATED SITE WORKS, LANDSCAPING AND A NEW ON SITE WASTE WATER TREATMENT SYSTEM
(1) RETENTION OF GROUND EXCAVATION WORKS WHICH INVOLVED THE REMOVAL OF STONE AND LEVELLING OF LANDS ON SITE AND (2) CONSTRUCTION OF A DWELLING HOUSE, INSTALLATION OF SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) RAISED ROOF INCORPORATING USEABLE FIRST FLOOR SPACE AND DORMER ROOF WINDOWS, (2) SINGLE STOREY EXTENSION TO THE REAR ELEVATION AND BAY WINDOW TO THE FRONT ELEVATION, (3) DETACHED STORAGE SHED AND FUEL STORE AND (4) SEPTIC TANK SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS, ALL RELATING TO EXISTING DWELLING HOUSE
INSTALLATION OF A SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS TO SERVICE EXISTING COTTAGE
(1) DEMOLITION OF SINGLE STOREY EXTENSION TO THE REAR ELEVATION OF EXISTING DWELLING HOUSE (2) CONSTRUCTION OF A NEW TWO STOREY EXTENSION AND 2 NO. ADDITIONAL WINDOW OPENINGS TO THE WESTERN SIDE GABLE (3) INSTALLATION OF A SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 37 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250161The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief