Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 520 decisions within 5 km, 7 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A DETACHED DOMESTIC GARAGE AND ASSOCIATED SITE DEVELOPMENT WORKS
DEMOLITION OF EXISTING DWELLING AND CONSTRUCTION OF NEW SINGLE-STOREY FAMILY DWELLING WITH ADJOINING ASSISTED LIVING UNIT, OUTBUILDING WITH THERAPY / SENSORY ROOMS, UTILIZING EXISTING CONNECTIONS TO PUBLIC SEWER AND ALL ANCILLARY SITE WORKS
ERECTION OF AN EXTENSION AND RENOVATIONS TO EXISTING DWELLING AND EXTENSION TO DOMESTIC STORE
DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM AND INSTALLATION OF A DOMESTIC WASTE WATER TREATMENT SYSTEM
DEVELOPMENT WORKS TO THE EXISTING SCHOOL TO CONSIST OF: 1) THE DEMOLITION AND REMOVAL OF EXISTING TEMPORARY PORTACABIN OFF SITE. 2) THE DEMOLITION OF EXISTING OFFICE TO MAKE PROVISION FOR THE NEW EXTENSION. 3) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE EAST OF THE EXISTING SCHOOL COMPRISING OF NEW CLASSROOM, OFFICE AND ASSOCIATED ACCOMMODATION. 4) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE NORTH OF THE EXISTING SCHOOL COMPRISING 2 NO. SET ROOMS. 5) SAFETY UPGRADES TO GOLF RD/L-2704-1 TO INCLUDE SPEED TABLE CONSTRUCTED AT EXISTING CROSSING BETWEEN SCHOOL AND CHURCH, DROP KERBS, GUARDRAILS, IMPACT RESISTANT BOLLARDS AND IMPROVED ROAD MARKINGS & SIGNAGE. 6) CONNECTION TO ON-SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF AN EXTENSION INCORPORATING AN ACCESSIBLE WC AND (2) ALTERATIONS TO EXISTING PEDESTRIAN ACCESS AND ACCESSIBLE PARKING AREA TO INCLUDE THE PROVISION OF LOW-LEVEL KERBS AND ALL ASSOCIATED SITE AND ANCILLARY DEVELOPMENT WORKS
The brief summarizes the pattern across all 520 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250281The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief