Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,197 decisions within 5 km, 7 exact-site or onsite candidate records, and 62 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
62 structured nearby appeal records.
62 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
SINGLE STOREY BUILDING TO ACCOMMODATE A NEW CLINICAL SKILLS DEPARTMENT AND THE EXTENSION OF THE EXISTING CAR PARK, LOCATED ALONG THE WEST SIDE OF THE CAMPUS AND ALL ASSOCIATED WORKS AND SITE WORKS INCLUDING CONNECTION TO EXISTING FOUL AND STORM DRAINAGE
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE EXISTING LABORATORY, LOCATED ALONG THE WEST SIDE OF THE CAMPUS, AND ALL ASSOCIATED WORKS AND SITE WORKS, INCLUDING CONNECTION TO EXISTING FOUL AND STORM RAINAGE
(1) RELOCATION OF AN EXISTING SERVICE WITHIN THE HOSPITAL TO A NEW DEDICATED ASEPTIC COMPOUNDING UNIT BUILDING OF 3 NO. STOREYS PLUS ROOFTOP PLANT ROOM W/LINK TO EXISTING HOSPITAL COMPRISING OF AN 802 SQ.M GROSS FLOOR AREA BUILDING CONSISTING OF: (A) GROUND FLOOR LEVEL - STAFF, OFFICE AND ANCILLARY SUPPORT ROOMS, (B) FIRST FLOOR LEVEL - ASEPTIC COMPOUNDING UNIT, (C) SECOND FLOOR LEVEL - ENCLOSED PLANT ROOM AND (D) ROOF LEVEL - ENCLOSED WATER TANK ROOM AND ROOF LEVEL PLANT INCL. SOLAR PV AND (2) SITE DRAINAGE AND ALL OTHER ASSOCIATED AND ANCILLARY WORKS ON A 0.04 HECTARE SITE TO THE WEST OF THE HOSPITAL SITE WITH ACCESS VIA THE MAIN HOSPITAL CAMPUS
CONSTRUCTION OF SMALL EXTENSIONS TO NORTH AND SOUTH ELEVATIONS AT SECOND AND THIRD FLOOR BETWEEN THE EXISTING MEDICAL EDUCATION AND TRAINING CENTRE AND EXISTING RENAL DEPARTMENT AT LETTERKENNY UNIVERSITY HOSPITAL TO FACILITATE THE REFURBISHMENT OF THE RENAL DEPARTMENT, WITH ASSOCIATED SITE WORKS
(A) PROVISION OF 2NR. NEW GAS STORAGE COMPOUNDS WITH ASSOCIATED HARD-STANDINGS, WALLS, STRUCTURES AND SECURITY FENCING, (B) 1NR. 5.6MSQ VAPORIZER PLANT ROOM AND ALL ASSOCIATED SITE WORKS AND INFRASTRUCTURE
DWELLING HOUSE AND ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 1,197 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250340The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief