Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 150 decisions within 5 km, 3 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A DWELLING HOUSE AND WASTEWATER TREATMENT SYSTEM WITH INTERMITTENT SOIL POLISHING FILTER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE, INSTALLATION OF A WASTE WATER TREATMENT SYSTEM AND SOIL POLISHING FILTER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION SOUTHERN ELEVATION OF EXISTING DWELLING HOUSE AND ATTACHED DOMESTIC GARAGE, (2) REBUILD SOUTHERN ELEVATION, CONSTRUCTION OF A SUN ROOM, PROJECTION TO EASTERN ELEVATION AND SMALL PORCH, ALTERATIONS AND MODIFICATIONS TO WINDOW AND DOOR PROFILES AND (3) NEW ROOF PROFILE
RELOCATION OF AN EXISTING TV AERIAL AND INSTALLATION OF TELECOMMUNICATIONS EQUIPMENT INCLUDING AN OMNI ANTENNA, A DISH, A GPS ANTENNA ON A PROPOSED WALL MOUNTED POLE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A NEW DWELLING HOUSE AND GARAGE WITH SEPTIC TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
INSTALLATION OF 1 NO. 12M STEEL MONOPOLE TELECOMMUNICATIONS STRUCTURE CARRYING 2 NO. RADIO-LINK DISHES, GROUND-BASED DUAL-BAY CABINET, FIBRE CHAMBER, 2.4M PALISADE FENCE WITH 1M ACCESS GATE, ANCILLARY EQUIPMENT, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED
The brief summarizes the pattern across all 150 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250347The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief