Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 207 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) DEMOLITION OF EXISTING UNAUTHORISED STABLE BLOCK / AGRICULTURAL STORAGE STRUCTURE (2) CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
A DETACHED DOMESTIC GARAGE AND ASSOCIATED SITE WORKS
CONSTRUCTION OF AN AGRICULTURAL SLATTED SHED AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE AND DETACHED DOMESTIC GARAGE, INSTALLATION OF SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) EXTENSIONS TO THE FRONT, SIDE AND REAR AT BOTH GROUND AND FIRST FLOOR LEVELS, WORKS INCLUDE ALTERATION TO THE MAIN ROOF DESIGN FROM A HIP ROOF TO A GABLE END ROOF DESIGN TO FACILITATE THE PROPOSED WORKS, (2) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF A REPLACEMENT SEPTIC TANK SYSTEM AND ASSOCIATED DRAINAGE AND (3) REMOVAL OF THE ROOF OVER THE EXISTING DETACHED DOMESTIC GARAGE AND PROVISION OF A REVISED ROOF DESIGN INCORPORATING ANCILLARY STORAGE SPACE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 207 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250365The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief