Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 262 decisions within 5 km, 5 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
REVISED RIDGE HEIGHT AND FLOOR LEVEL, ALTERNATIVE ELEVATIONAL DETAILS AND FENESTRATION TREATMENT WITH A HIPPED ROOF ON SINGLE STOREY ELEMENT FROM THAT GRANTED UNDER PLANNING REF: 07/20850
REVISED RIDGE HEIGHT AND FLOOR LEVEL, ALTERNATIVE ELEVATIONAL DETAIL AND FENESTRATION TREATMENT WITH A HIPPED ROOF ON SINGLE STOREY ELEMENT FROM THAT GRANTED UNDER PLANNING REF: 07/20850
CONSTRUCTION OF A DRY SHEEP SHED AND MACHINERY STORAGE SHED WITH SEEPAGE TANK AND ASSOCIATED SITE WORKS
A TEN YEAR DURATION FOR THE UPGRADING OF THE EXISTING WATER TREATMENT PLANT TO AN INCREASED CAPACITY OF 7,400 M3/DAY AS PART OF IMPROVEMENTS TO THE REGIONAL WATER SUPPLY SCHEME. (PREVIOUS PLANNING PERMISSION 17/50164 REFERS) CONSISTING OF (1) CONSTRUCTION OF AN EXTENSION TO THE FILTER GALLERY IN THE EXISTING WATER TREATMENT PLANT BUILDING, (2) CONSTRUCTION OF AN IMPROVED SLUDGE PROCESSING SYSTEM INCLUDING REMOVAL AND REPLACEMENT OF EXISTING TANKS, (3) DEMOLITION OF THE EXISTING SLUDGE PRESS BUILDING AND CONSTRUCTION OF A NEW SLUDGE PRESS BUILDING, (4) CONSTRUCTION OF A NEW BUILDING TO ACCOMMODATE EXISTING AND PROPOSED CHEMICAL STORAGE UNITS, (5) CONSTRUCTION OF NEW WASH-WATER RECOVERY SYSTEM INCLUDING REMOVAL AND REPLACEMENT OF EXISTING TANKS, (6) CONSTRUCTION OF A NEW ESB SUBSTATION, (7) CONSTRUCTION OF NEW UNDERGROUND TREATED WATER CONTACT TANK AND TREATED WATER STORAGE RESERVOIR AND (8) THE PROVISION OF TEMPORARY PROCESS UNITS TO FACILITATE CONSTRUCTION OF THE NEW WORKS, TOGETHER WITH SERVICE CONNECTIONS, IMPROVEMENT TO BOUNDARIES, LANDSCAPING AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A NEW DWELLING HOUSE, PROPRIETARY WASTE WATER TREATMENT SYSTEM, PERCOLATION AREA AND ASSOCIATED SITE WORKS
CHANGES TO GARAGE AND PERMISSION FOR A NEW LINK CORRIDOR AT FIRST FLOOR LEVEL FROM THE EXISTING DWELLING HOUSE TO THE FIRST FLOOR OF THE EXISTING DOMESTIC GARAGE AND DEVELOPMENT OF THE FIRST FLOOR AREA OF DOMESTIC GARAGE AS ADDITIONAL LIVING ACCOMODATION FOR THE EXISTING DWELLING HOUSE AND ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 262 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250402The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief