Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 223 decisions within 5 km, 5 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA
CHANGE OF HOUSE TYPE TO THAT PREVIOUSLY GRANTED (REG. REF. NO. 22/50403 REFERS)
CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA ALONG WITH ALL ANCILLARY WORKS
(1) ALTERATION, EXTENSION AND RENOVATION WORKS TO EXISTING DERELICT DWELLING HOUSE INCLUDING CONSTRUCTION OF EXTENSIONS TO THE REAR ELEVATION AND RAISING EXISTING PERIMETER WALLS AND ROOF HEIGHT TO PROVIDE FIRST FLOOR ACCOMMODATION, (2) INSTALLATION OF A NEW SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND (3) CONSTRUCTION OF A NEW VEHICULAR ENTRANCE AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED WORKS
The brief summarizes the pattern across all 223 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250404The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief