Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 124 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A SLATTED AGRICULTURAL SHED INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A SAND ARENA FOR THE EXERCISING OF HORSES
ERECTION OF DWELLING HOUSE WITH WASTERWATER TREATMENT SYSTEM AND PERCOLATION AREA
DEMOLITION OF EXISTING DWELLING AND ERECTION OF A NEW DWELLING HOUSE WITH WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA
RETENTION AND COMPLETION OF DWELLING HOUSE UNDER CONSTRUCTION WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK
The brief summarizes the pattern across all 124 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250408The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief