Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 157 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RETENTION OF (1) EXISTING DWELLING HOUSE AND GARAGE AND (2) RECONFIGURATION AND COMPLETION OF VEHICULAR ENTRANCE
(1) RETENTION AND COMPLETION OF (A) DWELLING HOUSE, DETACHED GARAGE AND STORE INCLUDING REVISED SITING AND DESIGN FROM THAT PREVIOUSLY APPROVED UNDER PLANNING REF. NO. 19/50240 AND (B) A VEHICULAR ENTRANCE AND ACCESS ROADWAY, (2) REALIGNMENT AND GRADING TO INTERNAL ACCESS ROADWAY WHICH IS THE SUBJECT OF RETENTION PERMISSION HEREIN AND (3) CONSTRUCTION OF AN AGRICULTURAL SHED AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
DEVELOPMENT WORKS AT THE GLENMORE BIOGAS PLANT, WHICH SHALL PROCESS ALTERNATIVE FEEDSTOCKS AND PRODUCE RENEWABLE ENERGY AND FERTILISER. THE DEVELOPMENT WILL BE ACCESSED VIA THE EXISTING INTERNAL CONNECTING ACCESS ROAD WITHIN GLENMORE ESTATE WHICH LINKS THE SITE TO THE R253. THE WORKS INVOLVE: (1) DEVELOPMENT WITHIN CURTILAGE OF THE EXISTING BIOGAS PLANT INVOLVING (A) THE CONSTRUCTION/ PROVISION OF AN EXTENSION TO THE EXISTING FEEDSTOCK (WASTE) RECEPTION BUILDING TO ACCOMMODATE FEEDSTOCK RECEPTION ACTIVITIES AND DIGESTATE PROCESSING EQUIPMENT, (B) GAS PURIFICATION AND COMPRESSION PLANT, (C) OFFICE EXTENSION (FIRST FLOOR OPEN PLAN), AND (D) EXTERNALLY LOCATED TEST TANK; (2) EXTENSION TO THE NORTHERN BOUNDARY OF THE BIOGAS PLANT TO ACCOMMODATE (A) INTERNAL ACCESS ROAD FROM THE EXISTING BIOGAS SITE, (B) CONCRETE RETENTION BUND, (C) 3 NO. DIGESTERS VESSELS WITH COLLECTION DOMES, (D) 3 NO. HYDROLYSIS TANK WITH COLLECTION COVERS, (E) PUMP HOUSES (2 NO.) AND ASSOCIATED PROCESS PIPEWORK, AND (F) STORMWATER ATTENUATION TANK, PETROL INTERCEPTOR AND ASSOCIATED PIPEWORK; (3) EXTENSION TO THE NORTHERN BOUNDARY OF THE BIOGAS PLANT TO ACCOMMODATE A FERTILISER PLANT, COMPRISING (A) FERTILISER PROCESSING BUILDING CONTAINING DIGESTATE PROCESSING EQUIPMENT, STORAGE AREAS AND ASSOCIATED, EXTERNALLY LOCATED, ODOUR CONTROL EQUIPMENT/EXHAUST STACK (17.5M IN HEIGHT), (B) LIQUID FERTILISER STORAGE TANKS (6 NO.), (C) HGV PARKING, (D) ALL PROCESS PIPEWORK AND ASSOCIATED DRAINAGE WORKS, AND (E) ASSOCIATED SITE WORKS INCLUDING FENCING AND LANDSCAPE SCREENING. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) AND RELATES TO DEVELOPMENT WHICH COMPRISES AN ACTIVITY REQUIRING AN INDUSTRIAL EMISSIONS LICENCE FROM THE ENVIRIONMENTAL PROTECTION AGENCY (EPA)
THE FLARE, PROCESS SUMP, WASHDOWN AREA,CO2 COMPRESSION BUILDING, 2 NO. CO2 TANKS AND WEIGHBRIDGE WHICH ARE IN LIEU OF THOSE APPROVED UNDER 14/51399. A BOILER HOUSE, CARBOSCAN CONTAINER, 2 NO. FURTHER CO2 TANKS, SECURITY HUT AT THE WEIGHTBRIDGE, A CONTROLS BUILDING, 3 NO. DIGESTATE DISPATCH TANK, 2 NO. TRANSFORMERS, ODUR CONTROL UNIT, OFFICE EXTENSION, EXTENSION TO THE NORTH -EAST CORNER OF THE YARD AND CLOSURE OF THE INTERNAL ROAD LINKING THE BIOGAS FACILITY TO THE WIDER GLENMORE ESTATE AT THE SOUTH EASTERN CORNER OF THE SITEAND ALL ASSOCIATED SITE WORKS ON LANDS ACCESSED OFF THE ADJOINING REGIONAL ROAD R-253-1 ASSOCIATED WITH GLENMORE ESTATES BIOGAS FACILITY
RETENTION & COMPLETION OF A RETAINING WALL, DETACHED GARAGE AND STORE AND ASSOCIATED SITE DEVELOPMENT WORKS.
The brief summarizes the pattern across all 157 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250573The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief